CV/Mission d'Administrateur IDO freelance

Je dépose une mission gratuitement
Je dépose mon CV
Vous êtes freelance ?
Sécurisez votre activité grâce au portage salarial !

Exemple de missions de Mark-Allen,
Administrateur IDO habitant ?

  • IT Project Manager

    ALPHA SYSTEMS SWITZERLAND – SWITZERLAND
    Jan 2022 - aujourd'hui

    Present
    IT Project Manager – Swiss Data Centre Exit to Microsoft Azure / Google Cloud
    The objective is to migrate several application suites along with the local SAP installation into Microsoft Azure and Google Cloud.
    Responsible for:
    - Analysis and discovery of complete system estate
    - Build and manage the global technical migration team
    - Managed the Azure and GCP landing zone design and other required documentation
    - Created and validated the Total Cost of Ownership (TCO) with Microsoft
    - Began the Landing Zone build for system deployment
    Daily Tasks and Accomplishments
    Managed all aspects of multiple related sub-projects to ensure the overall program is aligned to and directly supports the achievement of strategic objectives, i.e., multiple data centre exits
    As the DC exit project manager, I managed the day-to-day project activities and resources and chaired the project management team meetings
    Provided weekly status reporting regarding project milestones, deliverables, dependencies, risks and issues, communicating across leadership, internal and external
    Reported to Steering Board on project success criteria results, metrics, budget, test and deployment management activities across multiple levels of business users
    Prepare estimates and detailed project plan for all phases of the project
    Developed and delivered progress reports, proposals, requirements documentation and presentations to various audiences, including project team, sponsors, and key stakeholders
    Held regular key stakeholder meetings both internal and external for project review and project closure meetings, including regular meeting with Microsoft
    Design and build of the ‘server migration tracker’ documentation to manage the end-to-end migration process.
    Major contributor in developing the ‘stage gate’ deployment documentation containing the migration steps and the accompanying migration runbooks

  • IT Project Manager – Data Centre and Azure Migrations

    ALPHA SYSTEMS TRANSFORMATION LTD – LONDON, UK
    Jan 2022 - Jan 2022

    Working as the project manager for the Windows workstream, I am in charge of migrating systems from the on-premise data centre to Microsoft Azure. Objectives also including moving to the new Microsoft Windows Server 2022 system platform.
    This project also includes a data migration workstream to migrate over 15PB of data on old NetApp 7Mode hardware onto newer cDOT hardware. There are 18x current client locations spread through the USA, China, Hong Kong, Japan, and the UK.

  • IT Programme Manager

    CLARANET UK – LONDON, UK
    Jan 2021 - Jan 2022

    Transformation of Canadian Data Centre to Microsoft Azure
    Holding the responsibility for programme managing a global transformation project, including the migration of approximately 1,500 Windows servers to Microsoft Azure.
    Responsible for additional workstreams:
    - Analysis and transformation of PaaS candidates to Microsoft Azure Web Apps and SQL Managed Instances
    - Transformation of on-premise systems to a new operating system version in a new data centre
    - Microsoft SharePoint on-premise systems to SharePoint Online
    - Microsoft SQL Server analysis and consolidation
    Daily Tasks and Accomplishments
    Managed all aspects of multiple related sub-projects to ensure the overall program is aligned to and directly supports the achievement of strategic objectives, i.e., multiple data centre exits
    As programme manager, I managed the day-to-day project activities and resources and chaired the project management team meetings
    Provided weekly status reporting regarding project milestones, deliverables, dependencies, risks and issues, communicating across leadership, internal and external
    Reported to Steering Board on project success criteria results, metrics, budget, test and deployment management activities across multiple levels of business users
    Prepare estimates and detailed project plan for all phases of the project
    Developed and delivered progress reports, proposals, requirements documentation and presentations to various audiences, including project team, sponsors, and key stakeholders
    Held regular key stakeholder meetings both internal and external for project review and project closure meetings, including regular meeting with Microsoft
    Design and build of the ‘server migration tracker’ documentation to manage the end-to-end migration process.
    Major contributor in developing the ‘stage gate’ migration steps and the accompanying migration runbooks

  • IT Programme Manager– Migration of Data

    Centres to Azure Regions
    Jan 2020 - Jan 2021

    Holding the responsibility for programme managing a global transformation project, including the migration of over 3,000 Windows and Linux servers to Microsoft Azure.
    Responsible for additional workstreams:
    - Non-Azure – migration and lift-and-shift of several IBM AS/400 systems between data centres in the US and UK.
    - Design, build and installation of the Avaya Voice system replacing the normal analogue phone system
    - Installation of Veeam Backup platform to replace the Microsoft Azure cloud—based backups
    - Installation of a Windows Virtual Desktop (WVD) platform to host their old Citrix Horizon clients
    - Microsoft SQL Server analysis and consolidation using Redgate software
    - Assisted in the defining the migration process and documentation for a set of ‘unsupported’ systems to Microsoft Azure, including RedHat 4, Windows 7, and Windows Server 2003.
    Daily Tasks and Accomplishments
    Basically, the same as above, so no need to repeat.
    Assisted in the defining the migration process and documentation for a large number of ‘unsupported’ systems to Microsoft Azure, including RedHat 4, Windows 7, and Windows Server 2003.

  • IT Project Manager

    SWISS IT CONSULTANCY - Zurich,
    Jan 2019 - Jan 2019

    Holding the responsibility for designing, building, and installing company on-premise infrastructure and connecting to Microsoft Azure cloud subscription. Pivotal in migrating Windows server 2008/R2, Windows Server 2012/R2 to Windows Server 2016/2019.
    Completed the migration of systems and databases from old hosting company to Microsoft Azure, implementing Office 365 for company employees and externals, created security groups, and managed the SharePoint build.
    Managed significant challenges associated with the installation of basic company servers, including System Center 2016, SQL Servers, Dynamics CRM and Reporting servers, application servers, Azure communication servers, Veeam backup, and monitoring systems. Create and implement wide-ranging migration plan for current Windows Server 2008/R2, Windows Server 2012/R2, and Windows Server 2016 servers to Azure.

  • IT Project Manager

    CREDIT SUISSE - Zurich, Switzerland
    Jan 2018 - Jan 2018

    Managed a small team for discovery and data analysis experts as well as Oracle, MS SQL DBAs, and Linux/Windows engineers to streamline migration process of dozens of Petabytes of storage from old NetApp filers to new EMC arrays.
    Created the project plan and began the implementation of a three-year migration plan to minimise risks inherent in a data migration project. Spearheaded overall aspects of vFiler discovery, data analysis, new array preparation and build, array networking, and change requests.

  • Technical Project Manager

    ALPHA SYSTEMS  Switzerland
    2017 - 2018

    Contributed in company systems’ roadmap by designing and building on-premise Windows infrastructure on the basis of Windows Server 2016 Hyper-V servers.
    • Steered efforts towards instalment and configuration of Visual Studio Team Server connection and creating a small devops capability.
    • Originated a testing programme for Windows Server 2019 by switching the Windows Server 2016 Hyper-V hosts through migration of almost 100 servers; a mix of Windows Server 2008/R2, 2012/R2, and 2016.
    • Built on-premise Azure server migration pilots to produce the required outcomes, comprising Microsoft SharePoint 2016, Microsoft Dynamics CRM 2016, Microsoft Windows Deployment Server 2012, Microsoft System Center 2016, and Microsoft SQLServer 2016.

  • IT Project Manager

    T-SYSTEM NETHERLANDSHaag, Netherlands
    Jan 2014 - Jan 2017

    Directed and organised Linux admins, Oracle DBAs, networking and storage teams, along with the server build teams to migrate Linux applications and Oracle database servers for an Anglo-Dutch gas and oil international client. Completed and aligned processes for asset discovery, preparation, server build, networking, and firewall changes. Enhanced the operational efficiency of all migration processes, procedures, and documentation.
    • Led migration team to complete over 1,000 Linux and Oracle systems within time and budgetary restraints and reshaped migration cookbooks, project plans, runbooks, and communications that improved customer experience.
    • Significantly increased the migration performance and productivity through the instigation of new migration methods (the X-Motions).

  • T-SYSTEM NETHERLANDS

    Amsterdam, Netherlands
    Jan 2014 - Jan 2014

    Interim Programme Manager
    As temporary coverage, I improved proposal and ensured the accuracy of the contract’s technical points through the collaboration with bid team. Initiated and managed resource search process to define PM and technical resources requirement and implication. Originated programme budgeting and forecasting process through evaluating financial information. Monitored and ensured improvements of virtual platform descriptions and X2V migration process documentation.

  • T-SYSTEM NETHERLANDSIT Project Manager

    Eindhoven, Netherlands
    Jan 2010 - Jan 2014

    Led a team of eight personnel based in Europe and Asia, managed global verification and decommissioning of servers, and administered disposal of other hardware infrastructure globally while designating as Global Decomm Manager. Governed team to al...

Voir le profil complet de ce freelance

Profils similaires parfois recherchés

CV Administrateur IDO, Missions Administrateur IDO, Administrateur IDO freelance

Les nouvelles missions d'Administrateur IDO

Administrateur IDO

SOLARIS WINDOWS SERVER 2008
ASAP
31 - Toulouse
3 mois
Voir la mission

Chef de projet infrastructure

LINUX WINDOWS APACHE TOMCAT
02/06/2025
44 - Nantes
24 mois
Voir la mission

Leader Technique – Gestion des environnements et configurations - Anglais courant

LINUX UNIX AIX WINDOWS
05/05/2025
92 - COURBEVOIE
12 mois
Voir la mission

Ingénieur Workplace | Poste de Travail

WINDOWS SCCM GPO WINDOWS 10 ACTIVE DIRECTORY
01/05/2025
79 - NIORT
12 mois
Voir la mission

Ingénieur de production distribué

ZABBIX VTOM WINDOWS LINUX ELK
05/05/2025
75013 Paris
8 mois
Voir la mission

Ingénieur de production distribué

ZABBIX VTOM WINDOWS LINUX ELK
05/05/2025
75013 Paris
8 mois
Voir la mission

Développeur SIEM

SIEM Splunk Enterprise Security IHM
05/05/2025
44 - Nantes
3 mois
Voir la mission

Ingénieur poste de travail

WINDOWS 10 ANDROID CITRIX MDM SCCM
12/05/2025
92 - Boulogne-Billancourt
3 mois
Voir la mission

Ingénieur DEVOPSQ

VTOM CONTROL M ZABBIX APACHE TOMCAT
05/05/2025
69000
3 mois
Voir la mission

Contrôle Qualité Produit i media

HP ALM
19/05/2025
75 - PARIS
12 mois
Voir la mission
Je trouve ma mission

Les derniers CV d'Administrateur IDO disponibles

CV Administrateur système UNIX SOLARIS
Serge Pacôme

Administrateur système UNIX SOLARIS

  • abidjan
UNIX SOLARIS LINUX EMC CISCO VERITAS CLUSTER SERVER ORACLE 11G EMC AVAMAR
CV DBA VBA
Douglas

DBA VBA

  • Mandres-les-roses
SQL SERVER VISUAL BASIC VBA VB SCRIPT CRYSTAL REPORT EXCEL TRANSACT SQL VB.NET SQL SERVER INTEGRATION SERVICES
CV Administrateur système WINDOWS SERVER 2003
Laurent

Administrateur système WINDOWS SERVER 2003

  • LORRY LES METZ
ETHERNET HP VMWARE WINDOWS SERVER 2003
CV Chef de projet BASIC
François

Chef de projet BASIC

  • Voisins le Bretonneux
BASIC UNIVERSE COGNOS UNIX WORD CIEL COREL DRAW MS PROJECT POWERPOINT PUBLISHER
CV Chef de projet WINDOWS 2000
Benoit

Chef de projet WINDOWS 2000

  • Dallet
XWINDOWS WINDOWS 2000
CV Architecte réseaux WAN
Grégory

Architecte réseaux WAN

  • PARIS
SMNP TCP / IP WAN PROXY SERVER ROUTEURS SSL SUN SOLARIS NETSCREEN VMWARE ORACLE 9
CV Développeur .NET
Antoine-Jean

Développeur .NET

  • Godenvillers
TCP / IP ACCESS VISUAL BASIC BASIC ADSL SQL SERVER CRYSTAL REPORT TRANSACT SQL DTS .NET
CV Administrateur réseaux LOADRUNNER
Rachid

Administrateur réseaux LOADRUNNER

  • La Seyne Sur Mer
LOADRUNNER C C++ JAVA ETHERNET LOTUS NOTES LINUX APACHE DOMINO HP OPENVIEW
CV Architecte LDAP
Pascal

Architecte LDAP

  • Montreuil
LDAP LINUX PKI
CV Ingénieur de production LINUX
Paul

Ingénieur de production LINUX

  • MOËLAN-SUR-MER
LINUX NAGIOS WINDOWS SERVER 2003 XWINDOWS MYSQL TIME NAVIGATOR WINDOWS SERVER 2008 ZIMBRA
Je trouve mon freelance