Missions Pmo network : Trouvez votre futur emploi indépendant

Je dépose une mission gratuitement
Je dépose mon CV
Vous êtes freelance ?
Sécurisez votre activité grâce au portage salarial !

Exemple de missions de Jean-Michel,
Pmo network habitant le Val-de-Marne (94)

Since 2015 : OGANE – Partner, Ogane founder

2011 - 2015 : EFFIXENS – Partner, Effixens founder

2000 - 2010 : CGI – Director
PLAUT – Senior Project Manager
PLAUT – Project Manager

1998 – 2000 : PricewaterhouseCoopers (PWC) – Senior Consultant

1997 – 1998 : Coopers & Lybrand Consulting – Consultant

1997 : GFI – Junior Consultant

1992 – 1996 : Dupont Sanitaire Chauffage – Logistics Manager

IN DEEP RESUME
2017
Japanese industry – Study
Industry
Tokyo (Japan) / Taipei (Taiwan) – Expertise consulting
This mission, incl. the name of the customer is covered by a 10 years non-disclosure agreement.

2016 - 2017
Mondelez International / Carambar & Co / Eurazeo – Carve-out
Consumer goods
Clamart (France) – PMO for test & cutover
1 HQ, 5 production plants, 800 people, 10 major brands & 7 major licenses representing 250 M€ turnover. As Cutover & test manager – part of the PMO team - I was deeply involved from the beginning in the carve-out to Eurazeo Group. Responsible of delivering an up and running business for the new “Carambar & Co” entity in the frame of the May 2017 Release, I was in charge of the organization of the project office in Clamart for about 300 people coming from France and abroad during two weeks at each cutover period, including weekend and 24/24 cutover activities, the respect and application of the Mondelez IS/IT methodology, the explanation of the Mondelez methodology to the French teams, the involvement and coordination of the French Functional Leads in the global delivery as well as making them clear what was expected from them along the tied timeline, the follow-up of the achievement and report to the PMOs and Release Management, the organization, follow-up and animation of the local test cycles as well as tests results and defects and eventually the post-go live support.

2016
Adisseo – Salesforce deployment
Nutritional solutions and additives for animal feed
Antony (France) – Project Manager
Coordination of the deployment of additional functionalities of an existing Salesforce solution in North and South America, Asia and Europe. Follow-up of tests results and controlled start incl. ramp-up phase.

2015
Servier – SAP S/4 HANA Implementation
Pharmaceutical industry
Suresnes (France) – Transition Project Manager
As Integration Project Manager, responsible for the successful integration of the different processes into SAP S/4 HANA hosted by SAP as well as the project methodology during the Core model design phase. During the transition period, responsible for the creation of the tender (7 service companies), the analysis of the proposals and part of the final choice, the IS/IT Project’s tools and KPIs definition (RACI, planning, follow-up ….) and implementation, the Visual Management, the creation and implementation of the Quality Assurance Plan. On SAP side, support of the teams for the integration management and follow-up, providing expertise on SAP logistics’ topics, including study about SAP Simple Finance vs standard FI module as well as questions about Simple Logistics.

2012-2014
Vallourec – Implementation of a customer portal – Deployment of services & digital industry
Engineering, oil& gas and manufacturing
Düsseldorf (Germany) – Program Manager Assistant and IS Domain leader
Day-to-day Program Management: Follow-up of tasks (incl. fine grained planning), budget and funding (creation of the methods and associated tool, fine tuning, updates and reforecast), support to the Program Manager and preparation of top management presentation.
Functional expertise: In charge of the IS domain, with a particular focus on the two first modules of the « order-to-cash » B2B application (based on SharePoint a SQL) as well as change management, risks management (including the creation of the Business Continuity Plan, users management procedures and the legal aspects).

2011-2012
BMW - Advanced Parts Logistics in After Sales
Automotive
Munich (Germany), Strasbourg, Paris - Expert SAP & Processes
Definition and sizing of a processes reliabilization plan for the spare parts distribution center, including a full processes revamping and modeling (Visio). Implementation of the plan including some recommendations for SAP modifications (SD, MM, WM) as well as the implementation of a KPIs cockpit and a user’s club.

2011
Vallourec – Feasibility study for a customer portal – Deployment of services & digital industry
Engineering, oil& gas and manufacturing
Düsseldorf (Germany) – B2B expertise
IS/IT Master plan (next 5 years) including the analysis of the Business needs as well as the feasibility study on the global scope, the project brief for the first projects and the design of the first module to be implemented. This included also the budget scheduling and the creation of the budget tool.

2010
Alstom transport – Maintenance and train care SAP-based solution
Engineering, rail transportation and manufacturing
Ridderkerk (Netherlands) – Refurbishment plant – Project Director and SAP WM expert
Core model deployment of the SAP RailSys solution in an electronic control parts refurbishment plant. Changes were performed in MM and WM to fit with de physical moving of two warehouses and enable a smooth moving. The complex project’s context was due to the particular autonomy of the site.

2008 - 2010
Alstom transport – FRA-BE-LUX Project
Engineering, rail transportation and manufacturing
Paris, Charleroi (Belgium), Le Creusot – production plants – SAP Program Director Assistant
Conception and deployment follow-up of a new SAP Core Model. Coordination of a team composed of 40 people including external contractors. (QCD) Quality, Cost and Delivery follow-up.

2005 - 2010
Alstom transport – Maintenance and train care SAP-based solution
Engineering, rail transportation and manufacturing
Levallois-Perret (France) - RailSys Program Manager
Coordination of all deployments of the SAP maintenance and train care solution with all the other projects managers, including the optimization of the developments (shared or not) as well as specific local customizing in line with the different go-live dates. (QCD) Quality, Cost and Delivery follow-up. Budget follow-up and internal/external monthly reporting. Implementation of KPIs. This position was coupled with lots of deployments where I was involved as Project Manager (see below).

2006 - 2007
Alstom transport – Maintenance and train care SAP-based solution – Second AMTRAK deployment
Engineering, rail transportation and manufacturing
Chicago, Alliance, Washington DC (USA) – Project Manager and SAP WM expert
Core model deployment of the SAP RailSys solution, from a deep gap-analysis to the post go-live support. This deployment was done in the context of the moving of the warehouse from Washington DC to a Delaware site. A strong commitment on delivery date was required due particular sensitivity of the spare parts for AMTRAK rolling stocks.

2006
Alstom Power – ARIBA spend analysis – Interfaces refurbishment
Engineering, rail transportation and manufacturing
Paris – Business expert for audit and correction
The audit was conducted in the frame of a major crisis after a prior missed implementation causing severe and blocking issues in data transfer to ARIBA. The analysis was done on 40 interfaces (different back-ends to ARIBA) resulting in the full revamping of interfaces design as well as many corrections in the existing interfaces to mitigate the major and blocking issues.

2006
Janssen Cilag France – Business Intelligence tool design for the controlling department
Pharmaceutical industry
Paris – Business Expert
Business need definition in terms of Business intelligent tool for budgets follow-up, including a full review of the controlling organization. Presentation of the results to the top management.

2006
Janssen Cilag France – ARIBA Gap analysis
Pharmaceutical industry
Paris – Expert métier
Purchasing processes gap analysis before the implementation of ARIBA. Proposition for processes updates to smooth the AIRBA deployment. Implementation of additional recommendations to simplify the management of some purchasing categories (e.g. factoring, virtual lodged card …)

2006
Alstom transport – Maintenance and train care SAP-based solution – Ferromex deployment
Engineering, rail transportation and manufacturing
Monterrey (Mexico), Cuidad de Mexico, Paris – Project Manager
Core model deployment of the SAP RailSys solution, coordination of French and Mexican teams for the localization and enhancements of the Core Model in the frame of the project.

2005
Gefco – Scoping for a SAP SD/MM/BW Core Model
Automotive international third-party logistics (3PL)
Paris – Project Manager
Business need definition for the vehicle traceability reporting, based on the deep analysis of the delivery processes across Europe. Specifications including potential solutions based on SAP and BW (SAP BI tool).

2005
Alstom transport – Maintenance and train care SAP-based solution – First AMTRAK deployment
Engineering, rail transportation and manufacturing
New-York, Washington (USA) – Project Manager
Core model deployment of the SAP RailSys solution, including a real-time interfaced with AMTRAK maintenance tools. Implementation done in a tied contractual frame due to huge potential penalties to be paid to AMTRAK in case of delay.

2004-2005
Alstom transport – Maintenance and train care SAP-based solution – SBB, CFF, FFS
Engineering, rail transportation and manufacturing
Neuhausen am Rheinfall, Biel (Suisse) – Project Manager
Core model deployment of the SAP RailSys solution in the frame of a coming joint venture Alstom/SBB,CFF,FFS with as additional tasks a split of back-end systems and decommissioning of applications.

2004
Alstom Hydro – Deployment of a SAP core model
Engineering, power generation and manufacturing
Grenoble (France) – Project Manager
Based on an exis...

Voir le profil complet de ce freelance

Nos dernières missions de Pmo network à pourvoir

PMO Network

Cisco Fortinet Azure Zscaler
ASAP
75 - PARIS
36 mois
Voir la mission

PMO NETWORK

Project Management Office
ASAP
38 - Grenoble
3 mois
Voir la mission

Program manager Datacenter

Datacenter
ASAP
28 - Chartres
3 mois
Voir la mission

Consultant(e) AMOA

ASAP
Courbevoie
6 mois
Voir la mission

Architecte d'entreprise/Deployment Lead

ASAP
75008
3 jours ouvrés
Voir la mission

Manager Responsable Technical Services- Réseaux et Sécurité (F/H)

NETWORK IMMUNITY MANAGER (NIM) Network Installation Manager Sécurité Palo Alto Networks Cybersécurité
ASAP
LA DEFENSE
24 mois
Voir la mission
Je trouve ma mission