2019-2020 : Unified GEM workplace and Windows 10 migration
Engie Global Markets (ex GDF Suez Trading) via Artemys
Context: Due to Windows 7 end of support, GEM workplace must be upgraded to
Windows 10. There is still 2 workstation suppliers (3000 pc, 2/3 managed by EGM, 1/3
managed by Engie IT). This is also the opportunity to unify the computer workplace by
replacing Engie IT computers by EGM computers. In the meantime, GEM is growing
internationally and process should be created to deploy new Trading Desks in new
countries. Furthermore, the new Trading Software (Orchestrade) requires more powerful
computers to compute, new models must be purchased.
Achievement:
- Define the new Windows 10 environment to comply security constraints
- Define the new hardware catalogue
- Define the unified application catalog and define the business applications profiles.
- Follow the application remediation and order Ivanti sof tware to fix UAC and ACL
issues; this sof tware helped to avoid a huge remediation budget for legacy applications
- Steer and manage the windows 10 project
- Enhance skills, and mindset, and level of quality of the helpdesk team members,
during their onboarding in migration projects with the Workplace Engineers.
Digital & Workplace Service Manager
Léonardo ******** – ********.******** – +33 6 7373 4379 Page 2 of 11
- Define the processes to migrate Traders f rom the Engie IT network with Engie IT PC,
to the GEM network with GEM computers.
- Nexthink contract and build of the Cloud service for GEM in order to :
o Manage home working support due to Covid-19 situation
o Reduce costs of the support teams
o Automate common process of the Helpdesk and the Administrators with Service
Now integration
o Define KPI to follow the workplace user experience, the monitoring of the most
critical applications at end user level
- Study the technical organization and the governance to create/manage new
workplaces on dif ferent sites and countries
- Study of the modern workplace for GEM, based on Azure Active Directory, Intune and
White Glove process in collaboration with the hardware suppliers.
2018-2019 : Unified GEM workplace and Domain migration
Engie Global Markets (ex GDF Suez Trading) via Artemys
Context: Af ter Exchange Online migration, there is still 2 workstation suppliers (2600
pc, 60% managed by EGM, 40% managed by Engie IT). This is make applications running
on any computer, whatever provider it is. As f rom now, network restrictions prevented
running trading applications f rom Engie IT network, and the network flows were closed
between both networks. The Domain migration is also the opportunity to do a final
assessment and define what will be the unified GEM workplace.
Achievement:
- Migrate Engie IT computers and reduce the number of computers in use
- Follow the application packaging project to create all applications in both environment
(GEM and Engie IT)
- Work with Engie to increase the quality of support services on GEM workplace
- Perform an assessment of Engie IT capacity to comply GEM business service Level
when supporting users and computers
- Prepare the future unified workplace where GEM computer should remain the only PC
- Open the flows f rom the Trading network to Engie IT networks to support all
application consumed by GEM
- Deploy on GEM computers the most important applications that never worked before
(SAP and the VPN). As soon as these applications were deployed the business started
demanding to change their workplace environment.
- Resource hiring to build the new GEM workplace
- Increase relations with all technical actors delivering users interface (Citrix team,
Helpdesk, desktop engineers and architects)
S1 2018 : Exchange Online migration for Engie GEM
Engie Global Markets (ex GDF Suez Trading) via Artemys
Context: 4000 mailboxes hosted on premise in Exchange 2013 farm
End of supply contract to manage Exchange servers, expected on June 2018
Mailbox migration will the final step to migrate all Engie users in the Microsoft
Cloud Of fice 365
Remediation must be done on applications using mails services or mailboxes
Of fice 2016 Client migration ongoing as a requirement
Achievement:
Digital & Workplace Service Manager
Léonardo ******** – ********.******** – +33 6 7373 4379 Page 3 of 11
- Migrate all mailboxes and web services before S1 2018
- Ensure continuity of service without incident for critical business teams. Manage the
migration based on ACL between mailbox or user accounts
- Take into account VIP and assistants constraints
- Validate all requirements before migration
- Update Run processes for the supply chain
- Work on the litigation hold impacts (GDPR versus Trading compliancy and regulation)
- Participate in the change management communications (video streaming, Yammer…)
related to Of fice 365 applications
2017 : Active Directory Migration of Engie Global Markets in ENGIE forest
Engie Global Markets (ex GDF Suez Trading) via Artemys
Context: Users to migrate may have account on 3 dif ferent domains. The migration of
these 3 active directories in the Engie Forest is the final target to achieve at the end of
2018 (migration of the GEM Business Unit in the Engie Forest). The first milestone for
the GEM migration concerns Engie Global Markets
Sponsors: ENGIE CTO to lead this program at group level ; GEM CIO
Low impact on application, but remediation is expected
Various directories and meta directories (ADLS, FIM, OKTA, IAM…) are used to
provide credentials to access shared resources or application. Impacts on
these directories must be taken into account.
GEM is an International BU managed by local IT but only Belgium, France and
Singapore are in the scope of this first migration. Other countries must be
informed but will manage themselves the migration.
Integration in the new Engie PKI
Take into account 802.1X requirements for the migration of computers in
Brussels
Achievement: Migrate users and computer with « zero touch » process (scripting)
Migrate users and computers of EGM before End of 2017
Group migration and purge when possible
Upgrade of users and computers management environments (SSCM Current
Branch, Symantec Endpoint Protection 14)
Build of the new master to stage computers in the new forest
Update logon scripts, GPOs to comply the new policies
Update the life cycle process of user accounts
Update the supply chain processes and organize trainings
Deliver a console to migrate manually users and computers when required
(for missing people like travelers…; for missed computers that was not in the
inventory or that remain offline during the several waves of migration)
2016-2017 : Office 2016 migration of GEM in AppStore mode for 2000 people
Engie Global Markets (ex GDF Suez Trading) via le Permis Informatique
Context: 2 environments with Of fice 2007 and Of fice 2010
2 workstation suppliers to manage (3000 pc, 1/3 managed by EGM, 2/3
managed by Engie IT)
Application remediation (Macros, reports and linked application with Excel…)
Remain compliant with Engie Policy
Digital & Workplace Service Manager
Léonardo ******** – ********.******** – +33 6 7373 4379 Page 4 of 11
Achievement: Provide in the application store the last package to update/install Of fice
2016 and the Symantec Vault version 12
Process to migrate and purchase an E3 license instead of the default E1 Limit
impacts on remediation providing separate packages of former version of
Microsoft office components (word, Excel…)
Training for suppliers to support and manage Office 365 of fice applications
2015-2016: Windows 7 Migration (~1500 computers, 150 Applications, ~1.5 m€)
Engie Global Markets (ex GDF Suez Trading) via le Permis Informatique
Context: 3rd project leader after 18 month of project
1500 computers / 850 users
Trading and financial Constraints
100 packaged applications
50 built applications
Dev teams do not collaborate
Migration done by replacing hardware
Achievement: Relaunch the migration
Engage developers in the required remediation of their applications
Follow the applicative remediation
Build the migration process
Specify the new security policies
Follow and validate the build of the new master for staging and the new active
directory GPO
Build the fixed price contract to migrate all computers (rhythm: 50PC/week)
Manage and drive the Roll out Supplier
Training and engagement of the supply chains
Creation of the news Hardware catalog negotiated with Lenovo
Process to deliver obsolete hardware to a social institution instead of paying a
broker (850 PC delivered to EMMAUS and 10 other institutions)
2014 : Build of the Trading Floor of Roma (Italy)
GDF Suez Trading via le Permis Informatique
Context: Build network inf rastructure and desks for 20 traders in Italy
Premises are provided by Gdf Suez Italia
Trading application will be reachable via Citrix
Put in place the financial market network contracting with Etrali
Achievement: Build the trading floor
Service contract with GDF Suez Italy to support and host traders following the
financial requirement in terms of policy and compliance
Build the technical and network policies to comply the finance regulation
Manage traders requests
Training of the local IT
Create the supply chain for italian traders
2013 : Building of the mobile service for VEOLIA Eau and its infrastructure
(~7000 devices-750 md)
VETECH via IORGA
Digital & Workplace Service Manager
Léonardo ******** – ********.******** – +33 6 7373 4379 Page 5 of 11
Context: 6000 concerned user located in 30 regional centers
3000 former fleet of devices are running under WinCe
Front Inf rastructure of the application is built in Amazon Cloud
Authentication access is based on Google
The former hosted Inf rastructure were unstable
Gouvernance splitted between regions and Business units
Social context is tense (Strikes…)
Achievement: deploy 6000 Androids for business usage
Secure the server inf rastructure and the devices with required policies
Creation of the first Line Support
Building of the fleet management
Call for tender to choose an MDM solution
Creation of the service contract deploy, maintain and support the Mobile
device management solution (Citrix)
Study how to save money with operator contracts (SFR)
Creation of the mobility service offer for Veolia Eau
2012-2013 : Build secured technical infrastructures comply PCIDSS regulation
Vinci Autoroute via Neurones IT
Context: 320 toll stations
1 central IT Site
PCI DSS rules should be applied on all payment environments
Achievements: Follow the PCI DSS Audit recommendations to :
- upgrade the current payment inf rastructure of toll stations
- Update the processes to comply PCI DSS rules
- Awareness and to support technical and administration teams on PCI DSS
constraints
2011-2012: Responsible for implementing Secure Wifi Infrastructure and its
delivery service (500 man days)
Eif fage via Neurones IT
Context: 1000 sites distributed in 10 regional departments
20000 Windows XP/7 users
Achievement: Providing Wifi service in any location of Eif fage (including building sites)
Deployment capacity objectives in the next 3 years: 2,000 Wifi access
points
Main activities during the project:
- Participating in Market Study
- Involved in Secured Wifi request for proposal
- Organizing the proof of concept workshops with the 2 final tenderers
- Writing the Services Contract
- Following the delivery
- Managing the Implementation of the 3/3 Microsoft PKI
- Managing the building of the full redundant Wifi Inf rastructure in the client data center
- Change Management for Technical teams and existing processes
- Monitoring the Wifi deployment in 5 pilot sites located in 4 dif ferent regions of France
Digital & Workplace Service Manager
Léonardo ******** – ********.******** – +33 6 7373 4379 Page 6 of 11
Technologies:
- Security Certificates : Microsoft Windows 2008 3/3 PKI and OCSP
- 802.1X Authentication: Windows 2003 Radius IAS, Windows 2008 Radius NPS, Windows
2003 Active Directory and GPO
- Wifi : Aruba 3600 Controlers ; Remote and Campus Access Points, Mesh and Bridge
Mode
2010-2011: Responsible for Migrating Eiffage workstations from Windows XP/MS
Office 2003 to Windows 7/MS Office 2010 (1500 man days)
Eif fage via Neurones IT
Context: 1000 sites distributed in 10 regional departments
20000 users nearly all local administrators of their computer
50 sites fitted with des Inf rastructure servers (2003 AD, WSUS,
Antivirus)
Heterogeneous masters and applications depending on each region
25% of the applications are Citrix applications
Low WAN links (f rom 0.5 to 2 Mbit/s in 80% of the cases)
No packaging technology
No sof tware deployment tool
Achievements: Defining the workstation Master Pan
To be able to migrate 90% of all the computers in less than 3 years
Main activities during the project:
- Monitoring the technical audits
- Participating on the master plan which have finally suggested the following advices :
o Migrating the existing computers to Windows 7 and MS Of fice 2010 o
Preserving hardware computers (versus virtual ones)
o Implementing MS SCCM 2007 to streamline and to control the migration o
Finding the necessary budget for the next 3 years to migrate at least 90% of
the computers
- Involved in migration strategy
- Organizing and monitoring the necessary changes around the workstations (upgrades or
replacements) and the servers (updates or migration of printer servers…)
- Managing the building of MS SCCM 2007 Inf rastructure in the datacenter and inside 50
sites with distribution points installed
- Study and Inventory of existing computers
- Involved in the design of the single computer Master Image using MS MDT
- Managing the packaging design and rules using InstallShield 2010
- Organizing the technical staff training around the new tools and technologies
- Change Management for o Business units contacts and Directors o Each IT manager of
region o Users o IT Development Department o Service Desk and Hotline
- Designing and applying the new technical processes and the migration methods o At
sof tware level o At hardware level
- Managing the Migration for the first 1000 computers
- Setting up the indicators and follow up dashboards for: migration state, incidents,
problems and risks
Technologies:
- Deploying and asset management tool : Microsoft SCCM 2007
- Packaging : InstallShield 2010, Microsoft App-V
Digital & Workplace Service Manager
Léonardo ******** – ********.******** – +33 6 7373 4379 Page 7 of 11
- Master Image Building: MDT 2010
- Migration tools: Windows User State Migration Tool (USMT), Office Migration Planning
Manager for Macros compatibility and migration
2007-2009: Responsible for streamlining network and servers Infrastructures
Conseil général des Hauts de Seine (CG92) via Neurones IT
Context: 200 sites, 5000 Windows XP users
300 servers, half of them hosted in Prosodie Datacenters
50% of servers and applications are outdated (older than 7 years)
Unmaintained Inf rastructures
Achievements: Decrease hardware and sof tware applications to reduce charges around
hosting, maintaining and licensing
Designing the new machine hosting strategy
Main activities during the project:
- Writing CCTP contracts for the necessaries suppliers - Requests for proposal :
o Implementing a new Storage Area Network and migrating data f rom existing file
servers
o Implementing a new solution to protect the messaging inf rastructure against
spams
o Server Hosting and outsourcing
- Ordering service contracts and hardware within the current markets for:
o Building the Citrix Inf rastructure
o Implementing Vmware as the virtualization solution for validation and production
platforms
o Installing and configuring the HP SAN HP EVA4100 for Web Sites Inf rastructure
o Installaling and configuring the Hitachi SAN USPVM for all other inf rastructure
purposes.
- Sof tware and Hardware management
- Managing the hardware and software suppliers relationship
- Following up the streamlining of the inf rastructure within the datacenter of the hosting
supplier
- Managing works into the old datacenter of the CG92 building to ensure its compliance
with the security standards
- Designing and managing works to build the new network and security inf rastructure
into the new Datacenter of the CG92
- Virtualization of the oldest windows servers with Vmware technology
- Building the virtualized development and validation servers environments
- As far as possible, migrating production servers to Vmware Inf rastructure - Cloning
production servers environment to build validation platforms
Technologies:
- Network and Security: Checkpoint Firewall Clusters, Catalyst Cisco and NEXUS 4000
Cisco, Bluecoat Reverse Proxy, Symantec SMS8260
- Virtualization: Vmware ESX 3.5, Citrix Presentation Server 4.5, Platespin
- Hardware: SAN USPVM Hitachi, HENAS Hitachi, SAN HP EVA 4100, Brocade Switches,
HP Blade Servers
Digital & Workplace Service Manager
Léonardo ******** – ********.******** – +33 6 7373 4379 Page 8 of 11
Other projects
From 2012 Q4: Projects for Cofiroute
Via Neurones IT
• Managing the building of the OCR inf rastructure to recognize licence plates at the
A86 motorway exit
• PCI-DSS : Delivery support assistance around producing the necessary documents
for the PCI-DSS Audit
• Study and mananing the building of a mobile test platform providing the capabilities
to know if the suppliers equipments are compliant with the Toll Inf ormation System
From 2009 Q2 to 2012 Q2: other projects for Eiffage
Via Neurones IT
• Managing the migration of Antivirus Inf rastructure Kaspersky (300 md)
• Building the Disaster Recovery Plan for the messaging Service, built with Exchange
2008 Technology and hosted by Orange (200 md)
• Managing the building of an OCR platform to add indexed documents into Sharepoint.
Documents may come f rom printers or files (150 md)
• Managing the building of the IT PPM Application - Clarity v12 (80 md)
• Study to find out a mobile system to increase performances and ef ficiency of workers
during the last phase of a project wich is to carry out final inspections of
construction projects (50 md)
Restrictions: Tablet platform; Tablet application must work on any OS; Tablet
application must be linked with internal application platform to feed and received
information.
De Septembre 2006 à ce jour: Chef de projets chez NEURONES IT
J’ai travaillé au sein de l’équipe projets de production informatique d’EIFFAGE et auparavant au CG92. Dans ces missions j’ai eu en charge la gestion de portefeuilles de projets. En relation avec les services études, ou directement avec la production dans le cas de projets d’infrastructure, j’ai été amené à intervenir dans les différentes phases des projets (cadrage, cahier des charges, étude, rédaction des marchés, dépouillement, développement, déploiement). En tant qu’expert, je peux aussi intervenir pour qualifier les architectures. Responsable du pilotage des différentes équipes techniques et des fournisseurs et garant de la bonne mise en œuvre des nouveaux environnements au sein du SI, j’ai aussi eu la charge de pilotage des opérations de déploiement sur les postes de travail. Mes principaux projets ont été les suivant :
Client : Eiffage – Depuis Avril 2010
• Etude des solutions de mobilité pour répondre aux besoins métiers : 50 j/h
Recueil des besoins auprès du service méthode de la branche Eiffage Construction, pour mettre en œuvre une offre de service de mobilité. Cette offre devant répondre aux besoins actuels (suivi des chantiers) mais aussi à venir. Concernant les aspects techniques, l’étude a permis d’évaluer la capacité de la DSI à héberger les infrastructures centrales au lieu d’un mode SAS. L’offre devant permettre de s’interfacer avec les différentes couches applicatives que sont les outils de suivi et planification (Primavera), le système d’information géographique (ESRI). Coté tablette utilisateurs, il a fallu envisager une solution multi OS (Windows Mobile,7 ou 8 ; Androïd ; Apple IOS…)
• Mise en œuvre de l’offre de service Wifi sécurisé sur les chantiers et au sein des salles de réunion : 250j/h
Les principales phases du projet ont été :
- Rédaction et pilotage de l’appel d’offre pour le choix des soumissionnaires
- Mise en place de l’infrastructure centrale redondé sur des contrôleurs Aruba 3600
- Mise en place de l’infrastructure de sécurité (Serveurs Radius IAS et serveurs de PKI)
- Pilotage du déploiement sur les sites pilotes
- Elaboration de l’offre de service (délai/coût/ROI/niveau de service)
- Formation des équipes terrain
• Migration Windows 7/Office 2010 : 1400 j/h
Le déploiement de Windows 7 s’est fait d’une part par le renouvellement de postes et d’autre part en migrant les postes éligibles. Le déploiement concerne 20000 PC sur 2 ans et 1000 sites. Les fonctionnalités avancées de Windows 7 (Med-V et App-V) ont été utilisées pour limiter les régressions liées à la mise à jour du système. Le déploiement en mode projet a pris fin avec la migration des 1000 premiers postes de travail. Les principales phases du projet ont été :
- Accompagnement au changement et stratégie de déploiement
- Etude et qualification des 250 applications référencées
- Suivi du packaging InstallShield et App-V des applications et refonte du master MDT
- Pilotage des équipes de déploiement
- Mise en place des modes opératoires et des processus de gestion des anomalies de déploiement
• Mise à jour de l’infrastructure antivirus Kaspersky sur les postes clients et les serveurs: 300 j/h
Mise à jour de l’infrastructure antivirus (55 serveurs) et de l’ensemble des clients de type PC ou serveurs (20000 postes de travail et 1000 serveurs).
• Mise en place de l’infrastructure SCCM 2008 R2 : 250j/h
Mise en œuvre d’une solution pour le groupe (20000 postes de travail et 1000 serveurs) de la solution Microsoft de gestion des inventaires et du déploiement des applications. L’infrastructure est constituée d’une cinquantaine de serveurs secondaires distribués pour couvrir l’ensemble du territoire Eiffage. Les mises à jour de sécurité et les packages sont distribués en utilisant ces 50 points de distribution. Les offres de service de packaging et de déploiement ont créées à cette occasion.
• Mise en œuvre du protocole de tests de PRA de la messagerie Exchange 2008 et mise en application : 200j/h
• Mise en œuvre du service d’OCR vers MOSS : 150j/h technique
Le projet a permis de répondre aux besoins d’indexation des fichiers pdf après leur conversion OCR et de transfert dans la GED Microsoft SharePoint 2007. Les documents étant d’origine matérielle (scannés à partir des imprimantes multi fonctions) ou électronique (pdf images).
• Mise en œuvre technique de l’application PPM de la DSI : 80 j/h technique
Le progiciel CA Clarity permet de gérer le budget de la DSI, de suivre l’activité des collaborateurs, le planning et les coûts des projets de la DSI, et le taux d’occupation des ressources.
Client : Conseil Général des Hauts de Seine – Octobre 2006 à Mars 2010
• Réfection de salle Informatique du Conseil Général : Remise aux normes de la salle pour répondre aux contraintes techniques d’hébergement ainsi qu’aux normes de sécurités d’une salle « grise ». Ce projet a pris en compte les impacts sur le personnel et la nouvelle réorganisation de l’activité pour gérer la nouvelle salle.
• Etude pour la mise en place de l’archivage de messagerie.
• Consolidation des infrastructures serveurs : Rationalisation, Consolidation et Sécurisation des environnements serveurs. Pour répondre à ces exigences, il a été mis en place au niveau serveurs une architecture virtualisée avec Vmware ESX 3.5 et consolidée en utilisant des serveurs Lames HP.
• Mise en œuvre de l’architecture SAN/NAS Hitachi (USPVM et HENAS) du CG92 après avoir mené une étude auprès des grands acteurs du marché (EMC, Hitachi, NetApp).
• Migration des serveurs de fichiers sur le NAS Hitachi.
Pilotage de l’étude et choix du scénario de migration. Evolution de la sauvegarde pour prendre en compte les impacts sur la volumétrie et la fenêtre de sauvegarde (protocole NDMP).
• Mise en place de la nouvelle infrastructure Vmware et Oracle
Constitué de serveurs Blade HP connecté au SAN Hitachi, une ferme de 5 serveurs en cluster Vmware est désormais en place. Déploiement de 3 lames Oracle 10g connectées au SAN
• Mise en place de l’infrastructure de GED.
Constitué du SAN Hitachi, l’architecture virtuelle a été déployée avec la solution de GED Ever-Team Folder sous Windows 2003, Apache 2, Tomcat 5, Oracle 10g (non virtualisé).
• Mise en place de l’infrastructure du SI MDPH (Perceaval).
Constitué d’un environnement virtuel sous Windows 2003, Progress 9, Apache 2, avec 3 serveurs Tomcat 5 et Oracle 10g (non virtualisé). Coté clients, mise en place des périphériques Scanner pour la dématérialisation des documents. Ces documents sont intégrés dans la GED Folder.
• Migration Technique du portail Internet du CG92: Mise en œuvre des infrastructures constituant l’environnement du CG92. Constitué de 11 serveurs s’appuyant sur le CMS Vignette (VCM 7.5 pour l’environnement de contribution et Vignette VAP 7.4 pour la consultation du portail).
• Antispam Symantec SMS 8260 : Mise en œuvre de la solution d’antispam entièrement redondée permettant de bloquer les courriels polluants (qui représentent plus de 80% des mails reçus au Conseil Général).
• Citrix Presentation Server 4.0 : mise en place de l’architecture Citrix avec accès via laWeb Interface (3 serveurs) en SSO.
• Portail Intranet du CG92: Mise en œuvre des environnements constituant l’intranet du CG92. S’appuyant sur l’annuaire Echart Directory de l’entreprise, cet environnement est construit sur les solutions Vignette VCM 7.3 pour l’environnement de contribution et Vignette VAP 7.2 pour la consultation du portail.
• Unipass : Validation et mise en place des architectures permettant la personnalisation des badges d’accès au Conseil Général, utilisant les technologies Mifare (RFID).
Client : Zurfluh Feller - Octobre 2006
• Migration NT4/Exchange 5.5 vers AD2003/Exchange 2003 (100 utilisateurs / 25j/h)
En sous-traitance de DELL, mission de réalisation de la migration de l’environnement client de messagerie. Etude, mise en conformité de l’environnement, migration NT/2003 puis de la messagerie.
De 1999 à Septembre 2006 : Groupe SOGETI
Mission 3: Agence TéléService – Sogeti-Transiciel Ingénieur Système et Réseau Microsoft (09/2003 à 03/2006)
• Migration et modernisation des infrastructures informatiques de la Banque Solfea. (05/2005-03/2006-800j/h)
- Etude d’impact puis migration migration du parc sous Windows 2003 et XP
- Consolidation, Rationalisation et Fiabilisation de l’environnement de production
- Mise en place du PCS et du PCA technique
- Migration NT4 vers Active Directory et Exchange 5.5 vers 2003
- Gestion de la Migration des applications
• Externalisation des 20 serveurs de la Banque Solfea chez Interxion
(11/2004-01/2005 – 90j/h)
• Audits techniques lors des phases de Transitions d’infogérance auprès des nouveaux clients Matra Automobile en 2003 et Bolloré Holding en 2004
- Audit des environnements Windows et Citrix Metaframe
- Audit de l’architecture réseau.
- Audit des systèmes de sauvegarde et mise en place des nouvelles stratégies de sauvegardes
- Rédaction des documents d’architecture et d’exploitation.
- Formation des analystes d’exploitation et des pilotes.
- Participation à la rédaction du Plan Qualité de Service.
Mission 2: EUROSPORT – Ingénieur et responsable d’exploitation (10/2000 à 05/2003)
• Management de l'équipe d'ingénieurs d’exploitation des infrastructures Web et x86
L’équipe était constituée de 8 personnes travaillant en 2x8 7/7 jours. Ses principales missions ont été :
- Diagnostic et résolution des incidents d'exploitation
- Administration et Gestion des clusters SQL et EXCHANGE 2000
- Installation et paramétrage de plateformes complètes et mise en oeuvre des évolutions (migrations système, SQL2000 et applicatifs),
- Tunning et optimisation des Serveurs WEB IIS et SQL
- Création et suivi de la base inventaire matériel et applicatif et de la base d’incident
Mission 1 : 9 TELECOM – Ingénieur Système et Réseau (01/1999 à 09/2000)
• Juin à septembre 2000 : Coordinateur technique sur les projets Internet, Portail 9 et Plateforme de commerce électronique
• De 1999 à 2000 : responsable de l'équipe d'administration et d'exploitation des serveurs bureautiques. Les principales missions ont été :
L’administration des serveurs sous Windows de 9 Télécom et support niveau 2 utilisateurs (50 serveurs, 800 utilisateurs)
La mise à jour des serveurs pour l'an 2000
La migration SMS 1.2 vers SMS 2.0
Le déploiement et la prise en charge d'un nouveau site géographique de 200 personnes et 10 serveurs sur Malakoff
Août 1998 à décembre 1998 : ASTER CEPHAC
Technicien de maintenance et assistant administrateur réseau (10 serveurs NT et 150 PC)
• Assistance utilisateurs au niveau logiciels, système et hardware
Février 1998 à juillet 1998 : PC LEADER
Technicien au service après-vente
• Assistance téléphonique et dépannage matériel et logiciel
Octobre 1996 à février 1998 : SERVICE NATIONAL
Armée de l’Air à Balard : Technicien de maintenance informatique
1996 : ASSOCIATION ENFANTS DU MONDE DROITS DE L’HOMME
Stage de dernière année : Elaboration du cahier des charges, d’un synopsis et réalisation du scénario multimédia d’un CD-ROM sur les Droits de l’Enfant
1995 : IMAGIN’A SA
Stage entrant dans le cadre scolaire :
• PAO : Maquettiste prépresse ; Retouches d’images ; Elaboration de journaux, affiches et plaquettes dans les domaines de la publicité et de la communication
COMPETENCES FONCTIONNELLES
Rédaction d’appel d’offre, RFP, CCTP, PQP
Evaluation des besoins en ressources, en coûts et en délais projets
Connaissance du code des marchés publics
Rédaction de manuels techniques (DAT, DEX) ou de guide utilisateurs
Présentation de tableaux de bords
Gestion de la planification et des coûts projets
Gestion de la communication et conduite du changement
Gestion des risques
Pilotage de fournisseurs ou de prestations
Négociation et achat (matériels ou prestations intellectuelles)
Gestion des actifs et des logiciels
Suivi de contrats
Management d’équipes
ITIL
Elaboration et mise en application de processus
Elaboration et assistance à la mise en place de RACI
Qualification technique
Architecture : Réseau, sécurité, Stockage, Serveur x86, Postes de travail et Tablettes PC
Outils connus
Déploiement : Microsoft SMS 2003 et SCCM 2008, Landesk management Suite 8, Altiris
Masterisation : SCCM 2008 R2, MDT 2010, Installshield
Réplication : CA Brightstor HA, Double Take HA, Suresync
Ordonnanceur : CA Unicenter, Opalis Rendez-vous, ControlM
Supervision : GFI Network Server Monitor, IP Monitor, HP OV, Nagios, IBM Tivoli, Microsoft MOM 2003
Sauvegarde : Arcserve, BackupExec, Tivoli Storage Manager
Bureautique : Microsoft Office Project, Microsoft Visio, MS Office, CA Clarity
Gestion de parc : Remedy ARS, Staff & Line Actima
Décisionnel : Business Object 6, XI
ETL/EAI : Genio 6, IBM DataStage
LANGUES
ANGLAIS : technique
ESPAGNOL : scolaire
PORTUGAIS : courant
COMPETENCES TECHNIQUES
Connaissance Expertise
Systèmes
Notions : UNIX AIX, Novell Netware, IBM AS400
Linux Red Hat 4
Virtualisation :Vmware ESX, VSPhere, HyperV Citrix Presentation Server 4.5
Windows 2008, XP, Windows 7, Med-V, AppV WINDOWS NT4/2000/2003 Server, Cluster MSCS NT4/2000/2003, Active Directory
Réseau et sécurité
VLAN, Spanning Tree, Routeurs HSRP, VPN, FireWall, Sondes IPS/IDS, QoS, Reverse Proxy, SSO, Annuaire Ldap, IAS, PKI, Wifi 802.11, 802.1x DNS, WINS, DHCP, RAS, NLB
Antivirus : Trend OfficeScan ServerProtect, ScanMail for Exchange, Kasperky v8
Antispam : Symantec SMS8260
Internet
Apache, Tomcat, Weblogic, Websphere
Vignette VAP, VCM. IIS 4.0/5.0/6.0
SGBD
Microsoft SQL Server 2000/2003, MySQL 5
Sybase ASE 12, Oracle 8i/9i/10g/11g
Messagerie
Lotus Notes, Novell Groupwise, Exchange 2008 Microsoft Exchange Server 5.5/2000/2003
Matériels
Serveurs IBM, Switchs HP
Switch et routeurs Cisco
Contrôleur Aruba, Juniper,
Pare Feu Checkpoint, Fortinet
Solutions SAN/ NAS Hitachi, EMC, NetApp, HP (SCSI ou Fibre), Zoning, Serveurs Proliant HP et Dell PowerEdge
ETUDES ET FORMATIONS
2013 One to one English course in London during one week (20 hours)
2007 Logix Paris "Vmware infrastructure 3 - Install and Configure"
2004 IB Formation "Mise à jour des compétences Exchange 5.5 à Microsoft Exchange Server 2003"
2003 IB Formation "Implémentation et administration des services annuaires de Windows 2000"
1996 IUP (Master) – Ingénierie de communication –option Multimédia (Paris XIII)
1994 DEUG A – Sciences et structure de la matière (Paris XII)
1992 Mathématiques supérieures
1991 BAC C