- February 01 – February 02: Project I-21 (Pan European Network for Interoute).
Supervision and approval of the deployment of 52 sites in Europe based on the latest Alcatel Transmission equipment platform including commissioning tests:
- DWDM equipment STM-64 (1640WM).
- ADM SDH equipment STM-64 (1670SM).
- April 00-February 01:Transmission Project Co-ordinator for Cable & Wireless on the
deployment of :
- the Pan European Network in France.
- the interconnection with Bouygues Telecom.
- the transmission of the Global Network IP (Juniper + Foundry + Cisco).
Participation on unbundling tests in France with France Telecom (xDSL equipment : Lucent, Nortel and Ericsson).
Participation on the design and the launch of the first DWDM metropolitan ring for C&W in Paris.
Nortel Equipment used : TN-4XE, TN-1X, TN-64X, Optera LH, Optera Metro, Cross-connect Marconi.
- January 00-April 00: SMW-3-Upgrade-Segment 08-Marmaris (Turkey).
Installation, Acceptance Tests, Integration Tests and Commissioning Tests of upgrade components on Equipment on traffic.
- WDM Terminal (Alcatel OALW16).
- SDH Equipment (Alcatel 1664SM).
- Supervision Monitoring System (HP UNIX « Open view »).
Training of new Alcatel technician.
- November 99-December 99: SMW-3-Upgrade-Segment 08-Alexandria (Egypt).
Installation and Acceptance Tests of upgrade components on Equipment on traffic.
- WDM Terminal (Alcatel OALW16).
- Supervision Monitoring System (HP UNIX « Open View »).
- February 99 – November 99: Atlantis-2-Fortaleza (Brazil).
Station Manager: Installation, Acceptance Tests, Integration Tests and Commissioning Tests:
- Power Feeding Equipment 10 kV (NEC).
- WDM Terminal (Alcatel OALW16).
- SDH Equipment (Alcatel 1664SM and 1641SM).
- Supervision Monitoring System (HP UNIX « Open view » and Cisco router 2500).
- Order Wire (Alcatel PBX 4400).
- Submarine Cable and Alcatel repeater R3.
- December 98-February 99: SMW-3-Segment 10-Norden (Germany).
Manager of Commissioning Tests in Norden Station:
- Power Feeding Equipment 10 kV (Alcatel)
- WDM Terminal (Alcatel OALW16).
- SDH Equipment (Alcatel 1664SM).
- Order Wire (NewBridge).
- Supervision Monitoring System (HP UNIX « Open view » and Cisco router 2500).
Project UK-Germany-6 (O.TEL.O Station and Deutsche Telekom Station)
Assistance on Commissioning Tests using Alcatel Equipment.
- End of November 98 : SMW-3-Segment 02-Tungku (Brunei)
Assistance on Installation and Acceptance Tests:
- Power Feeding Equipment 2,5 kV (Alcatel).
- WDM Terminal (Alcatel OALW16).
- September 98-November 98: SMW-3-Segment 10-Norden (Germany).
Manager of Acceptance Tests and Integration Tests:
- Power Feeding Equipment 10 kV (Alcatel)
- WDM Terminal (Alcatel OALW16).
- SDH Equipment (Alcatel 1664SM).
- Order Wire (NewBridge).
- Supervision Monitoring System ( HP Unix « Open view »)
Project UK-Germany-6 (O.TEL.O Station and Deutsche Telekom Station).
Assistance on Installation, Acceptance Tests and Integration Tests using Alcatel Equipment.
- July 98-August 98: SMW-3-Segment 08-Marmaris (Turkey).
Installation and Acceptance Tests:
- WDM Terminal (Alcatel OALW16).
- Order-Wire (NewBridge).
- April to June 1998: School training in Alcatel Submarine Networks France.
Subject: Putting into service and Acceptance test of the first WDM terminal (Alcatel OALW16) on site (UK-Oxwich Bay for Gemini project).
FORMATION
- November 00: Training on Nortel SDH equipment: TN-64X.
- June and August 00: Training on Nortel DWDM equipment : Optera Metro and Optera LH.
- 1996/1998: Student in Electricity and Industrial Data-Processing Engineering in the University Institute of Technology located in Brest (FRANCE).
Obtaining of the University Diploma of Technology.
- 1995/1996: Scientific School leaving examinations leading to university entrance qualification with technology option (obtained with distinction).
Langues :
English: read, write, and speak.
Portuguese: read, write and speak.
Spanish: smattering.