Migration des systèmes ECC de ECC EHP5 Solaris/Oracle.2 vers ECC EHP7 Linux/ORACLE 12.1
Migration des systèmes BW de NW 7.3 Solaris/Oracle 11.2 vers NW 7.4 Linux/ORACLE 12.1
Migration de la base de données BO de Solaris / Oracle 11.2 vers Linux / Oracle 12.1
Administration/installation/configuration de OPENTEXT Data Archiving for SAP server
Migration d’OPENTEXT de la version 9.2 vers 10.5
Installation VIM (Vendor Invoice management – Gestion des factures)
Administration des systèmes SAP SLT/HANA (L'OREAL/MHIS)
Installation & Administration des nouveaux Landscapes CMA-CGM : AIX/LINUX & SAP/DB2 : ECC/PO/EP/EM/TM/BIBO/HANA
Migration PI 7.1 vers PI 7.4 (L'OREAL)
Installation de SAP BOBI/DB2 Multi AS - CMA-CGM / TOMCAT
Administration des systèmes SAP HANA Multitenant (MDC) (L'Oreal)
Migration des bases de données SAP/Oracle à la version 12.x
Système Copy SAP BW / Hana
Hana & SLT High Availability: DB Standby configuration & bascule test. (MHIS / L’Oréal)
installation SAP BW sur une base de données Hana
Refresh / Système Copie sur des systèmes BW/Hana
Migration des Systèmes BW using DMO vers SAP HANA.
Orange Business Services 05/2015-08/2015 : SAP Basis Expert Consultant
SAGEMCOM :
Faire le suivi et la coordination entre le client et les équipes internes et externes
Faire des projets d'install & refresh des systèmes SAP
Administration des Systèmes SAP, BIBO
Adobe Document Services
Les Aéroports de Montréal (ADM)
Installation et configuration de Solution manager : (SQLServer 2012/ Windows)
Mise en place de SSO 2.0 Kerberos
Administration de la base SQLServer2012
EACOM : OSDB Migration (CANADA)
From 3.0B (Maxdb/HPUX) to BW 7,4 (Sybase/Linux)
From R3 4.6C (Maxdb/HPUX) to ECC6 EHP7 (Sybase/Linux)
Solman monitoring Configuration
Mondou :
Projet E-Commerce (non SAP système)
administration SAP/SQLServer (Québec)
Communication avec SAP en REST : Installation SAP PI AEX 7.4
Vicrtoria Ville :
SAP BW Precalculation server : installation & configuration
Conception et développement des interfaces PI 7.4
Mapping ABAP, JAVA, XSLT.
Développer des interfaces IDOC – Files
Administration des systèmes SAP des comptes : Canal+, Saint Hubert, JCDecaux
(ECC, BI, PI, EP, CRM, SRM)
SAP systèmes performance “monitoring & analyzing”
Backup & Restore : Brtools, NetBackup.
Résolution des incidents N2/N3
Gestion des autorisations, création des rôles et des profiles
Projets:
Installation & Configuration de Solman 7.1 Stack 10 (SP10) sous Windows / Oracle (CANAL+)
SAP Java systèmes refresh Export/Import sous Windows / Oracle (CANAL+)
SAP Entreprise Portal upgrade from 7.02 to NW 7.4
SAP ECC Install using SUM sous Windows – Oracle (CANAL+)
SAP SLO Install & Config
SAP ABAP système upgrade avec Near Zero Downtime (NZDT) method
SAP SRM/ECC/BW STACK Upgrade SUM – NZD
SAP EP Upgrade to 7.41
SAP Router SNC updating
SAP Migration Oracle/Hana (SUM/DMO)
Installation & Configuration de Linux SUSE 11.x
Installation/Configuration/Administration SAP HANA
HANA Client, HANA Studio, HANA Database
HANA LifeCycle Manager (On site Configuration tool…)
HANA Patching & upgrade
Patching HLM, AFL {PAL,BFL}
HDBLCM…
SAP Business One for HANA install & Configure
Installation & configuration de SAP SLT & DATA réplication
« High Availability » : Mise en place de réplication primaire/secondaire en mode synchrone/Ajout des nœuds
SAP BW : Créer des infobjects, Infocubes, Data load, Infopackage, DTP…
SAP PI : développer des scénarios PI 7.11
IDOC TO File, RFC to File, JDBC to JDBC
ABAP Proxy
mapping Java, Mapping Abap, Mapping XSLT…
SOLMAN AIM & CharM installation & configuration : définition des profiles, des actions, des transactions types, les partenaires, Organisation modèle, Automatique Support determination, CharM Configuration, Transport Configuration etc...
SAP Data Services:
Configuring and loading Data to SAP HANA from SAP ECC or BW using DataServices
Using SAP DS for doing data extraction and transformation (ETL)
Developing DataFlows : DB TO DB or File IDOC to XML
Developing PI PROXY
developing ABAP WEB DYNPRO
Administration des systèmes SAP BPC (Version Netweaver): Data modeling, Création des modèles, gestion de sécurité, création des dimensions, EPM-Addin, Data manager, création des packages….
BIG DATA: Hadoop/Hana install and configuration.
Hive, Spark, Impala: install & configuration
SAP Hana Smart Data Access
Upgrade Solman de 7.1 à 7.2
Administration des systèmes SAP : XI/PI BW/BI APO/SCM R3/ECC LiveCache Solman Abap/Java Opentext achiving StreamServe Columbus
System Copy/Refresh: R3/BW/SCM
SAP BPC / IIS / .Net FrameWork / Windows Script install
Activer SAP BPC Content
SAP PCM services administration (MHIS)
SAP HANA SLT administration (MHIS)
SAP Solution manager 7.1 install & configure
SAP Systems troubleshooting
SAP systems amelioration des performances (improving & tuning)
OS/DB migration Homogeneous / Heterogeneous
SAP PI: Java Déploiement/ XI Content avec: SDM, JSPM, Integration Builder, SLD Content, SAP PI Business content install
LiveCache: Administration/Patching/Upgrading / Consistency check
Administration des CIF / IDOC (R3/SCM)
Implementation XI AS, Webdispatcher, JVM update
XI Messages: administration & monitoring (BPE, IE, AE, Communication channel)
PI/J2EE Admin tools: Configtool Visual Administrator, Netweaver Admin
Update SAP PI SOAP interfaces: Target URL & SOAP ACTION
SAP PI CTS+ configuration
SAP PI IDOC Adapters configuration
BW: Query performance (OLAP access)
Process chains monitoring and analyzing, data sources activate & replicate, Infocubes & dimensions size compare, line item dimension,
Solution manager: Install/Configure & manage satellite system / MOPZ generation / transport
SLD landscape administration, Repository Content update…
PI sender & receiver adapters Administration
OSDB Migration of SAP to AIX systems
Archivage des messages SAP PI plus la mise en place de la table Switch.
Administration & configuration of SNC encryption , SSO, ADS, JCO, RFC, CUA, CTS+, BRTOOLS, ICM/ITS, UME, SAP License administration, CMS, SLD, SAP JVM
Open Text Archiving administration
Printing Server: Columbus Administration, Streamserve, Columbus Central/local Gateway – Print Channel…
Archivage des IDOC et des messages de PI (implémentation & administration)
Tuning des bases de données Oracle 11.2 les backup/restore RMAN Export-Import gestion des privilèges création des objets : tables, indexes … Database/Table réorganisation…
Analyse et Gestion des autorisations
SAP BusinessObjects Web Intelligence (NSIT CONSULTING & Engineering)
Projets:
IAM (Maroc Telecom): ECC 6 Unicode migration de R3 4.7 à ECC6 EHP5 (SAP Netweaver 7.0 EHP2)
(OSDB migration de HP-UX PA-Risc à HP Itanium,
Oracle Migration de HP-UX PA-Risc à HP Itanium,
Unicode migration
Mise à niveau Oracle 9.2 à Oracle 11.2 et de HP-UX 11.11 à HP-UX 11.31)
L’Oréal Asie : SAP PI install & configuration (SAP Netweaver 7.1)
L’Oréal : StreamServe install and configuration
L’Oréal Asie SAP SCM install & CIF configuration avec ECC (06/2013) (SAP Netweaver 7.0 EHP2)
L’Oréal : Move vers IBM Power 7 + New landscape Asie : ECC 6.0 /SCM 7.0 /BW 7.3 (en cours)
Upgrade Unicode (OSDB migration : linux, Oracle spliting, MIGMON ….) + Upgrade de ECC5 vers ECC 6 EHP6 (CU&UC) (AIR FRANCE 2013 – en cours)
Solution Manager & EWA : configuration & implementation (SOFICOR MÄDER / IBM – 2012/2013)
Solution Manager & EWA : configuration & implementation (AIGLE – 2013)
Solution Manager & EWA : configuration & implementation (Filhet Allard) – SOLMAN sous AS400 / ORACLE
Solution manager IT Service (HelpDesk) configuration (for IBM India)
BI Upgrade to 7.3 (SAP Netweaver 7.3) (L’Oreal – 2012)
ECC 6 EHP5 (L’Oreal – 2012) (SAP Netweaver 7.0 EHP2)
Projet Migration hébergement-infogérance système SAPHIR – Heterogeneous OSDB migration from HP/Oracle to IBM Aix/Oracle (Eurovia – 2011)
SAINT-GOBAIN ISIS 08/2012 & AGILE 09/2011: Disaster Recovery
DRP SAP SCM + LiveCache in the standby server -Blade/ Windows 2003 / SqlServer 2005
SAINT GOBAIN ISIS install standby system
Upgrade to ECC6 EHP4 (FAYAT – 2011)
Upgrade to SCM 7.0 (MHIS - 2011) (SAP Netweaver 7.0)
CUUC : Upgrade Unicode + Upgrade de ECC6 EHP4 (DANONE 2010) (OSDB migration : DB2/AIX)
Upgrade to ECC 6 (Saint-Gobain HOPIS 2008-2009)
Upgrade to BI 7.0 (Eurovia 2008-2009)
L’Oreal DataCenter Move (all systems from USA & Belgium to France) (L’Oréal - 2009)
Oracle upgrade & patching (to 10.2.04 / 11.2.0.2) (L’Oréal - 2011)
Upgrade to SCM 7.0 (L’Oréal) (SAP Netweaver 7.0)
Upgrade Unicode “SCM” (Danone - 2010) (SAP Netweaver 7.0)
Upgrade SCM (Danone - 2010)
Upgrade PI 7.1 (L’Oreal - 2010)
Upgrade XI ABAP+J2EE 3.0: from stack 17 to stack 20 (L’Oréal 2007)
Add / install XI AS, Webdispatcher (L’Oréal 2008)
Upgrade L’Oréal databases: from Oracle 9.2 to 10g and from 10.2 to 11g (11.2)
Migration d’oracle 9.2.0.7 vers 10.2.0.2
Migration de BW vers BI 7 et ajout des applications serveurs BW
Rafraichir les systèmes SAP R3, BW
Connecter les systèmes BW à des systèmes sources (R3 BW …)
Administrer les systèmes SAP : Content Server, SAPDB , MAXDB,ICM, SAP WEB Dispatcher
Restaurer les bases de données SAP (en utilisant br*tools & backint)
Partitionner les tables BW
Oracle/Brtools : Equilibrer la repartitionnement des données sur les filesystèmes (déplacement des datafiles) pour améliorer les temps des backups (old method)
Administrer les bases de données en mode standby
Administration de SAP sous Oracle & Unix Tru64
Heterogeneous OSDB migration Oracle/Tru64 to Oracle/HP Itanium
Heterogeneous OSDB migration Oracle/Linux to Oracle/Tru64
Administration des sauvegardes « RMAN & BR*tools »
Superviser les performances des systèmes SAP & Oracle & Unix
Analyser les traitements lourds (SQL // ABAP)
Améliorer les performances des systèmes SAP
Capacité management des systèmes SAP
Gestion des autorisations (HR FI/CO SD/MM) : Création des profiles/rôles
Mise à jour de SAP de la 40B à la 46C