Technician informatique
Ref : 260604R001-
Date de début12/06/2026
-
Localisation
13003 MARSEILLE
-
Durée1 jours ouvrés
-
Tarif Journalier MoyenVoir le tarif
Installation of Network devices in the Datacenter
Photos must be submitted and approved before moving to the next phase:
Phase 1 – Equipment Validation: Unopened boxes, shipping labels, packing lists, SN tags, group equipment shot
Phase 2 – Rack & Stack: Pre-rack (6 shots) + Post-rack (5 shots) including rack ID label, RU locations, and device label
Phase 3 – Patching: Front/back close-ups of firewall + wide front/back rack shots
Phase 4 – Labeling: A & Z side labels for all fiber, copper, and power cables
Phase 5 – Final: Front/back close-ups + wide rack shots (door open and closed)
REQUIRED TOOLS (tech to carry)
Laptop + charger | Label maker (2-line, black on white) | Phone with camera | Screwdrivers & bits | Cage nuts & screws | Velcro | Console cable