PROFESSIONAL EXPERIENCE
ALCATEL-LUCENT COTE D’IVOIRE:
CONSULTANT:
SITE SUPERVISOR; CW, INSTALATION SUPERVISOR AND COMMISSIONING FH, BTS
ACCEPTANCE
RADIO MESURMENT
Supervision of all civil engineering works from the start site
supervision mounting pylon and installation of equipment (BTS, Bay Energy, Feeders, FH)
RF measurement and analysis of curves and preparation of report
reportage photos site
Conmmissioning FH
Routing and setting air site
NXT (Network Expertise Tunisia (2005-2008)
Chief equip
• Installation and start-up of the radio operator systems ;
-Installation and commissioning of ALCATEL MW :
-LUX94XX (Nectas)
-UX94XX (Nectas)
- AWY (1320CT)
-Installation and commissioning of the stations bases (BTS) ALCATEL (MBO1,MBO2)
-Installation of NEC MW V2,V3(approximately 30 PDH links)
• Installation of Rectifier
• Electric wiring and wiring of earthling of a site GSM and as well installation RF (more than 40 sites GSM)
• Installation of WIFI links: installation 04 links
• Installation of the systems of safety PROTECTA (horizontal and vertical life line, CPC project)
• Radio measurement with TECTRONIX and ANRITSU site master
• commissioning MW Alcatel LUX 94 XX, UX94XX et AWY
• commissioning BTS G2 EVOLIUM
• Installation of GSM and DCS antennas
• Civil engineering
05 months mission in ivory cotes
(Alcatel, orange) Project 2007
• Installation of basic stations GSM
• Wiring out-door and in-door
• Commissioning of BTS G2 EVOLIUM
• Commissioning MW Alcatel LUX 94XX, UX94XX , AWY
• Installation of RECTIFIER and DDF
• Installation of OMNI antennas
• wiring of the alarms : door AC , smoke detector, high
temperature
•Installation of electrical box , HAWKSONE commander
• Radio measurement
Supervisor, civil engineering
Site and CW supervision;
•supervisor of civil work : base ,column ;concrete, to follow the installation tubular and corner tower or masts
-Control and supervision of construction and assembly
- Control of wiring and installation of equipment;
- the antennas , feeders , jumpers , connectors installation
- BTS Siemens or Alcatel installation
- supervisor of transmission equipment installation
- MW and co-axe installation
- RF Measurement
- Acceptance of site with the customer
Tunisia Telecom Project
SITE SUPPERVISOR and CW ENGINEER
Maintenance, and audited of GSM sites;
• RBS ERECSON (2102, 2202, 2106,2206)
• ERECSON MW
• NEC MW and SDH
• BTS ALCATEL
• Supervision of antennas installation; azimuth and tilt
• SAGEM links to install MMU
• Supervision of antennas, feeders, connectors and jumpers installation
• Supervision and control of the BBS, DF BFU, PSU
• TEST of batteries autonomy by discharging table
• Civil work supervision;
-0 Checking of the equipment installation
-1 checking of the site civil structure
checking of the wiring alarms : door AC , smoke detector high temperature
Responsible for GSM sites
• Control and planning teams, followed works, rapports of the daily work
• technical coordination
• Analyze of rapports and giving results, solutions to the client
SASCOM (TUNISIA- 2004-205)
High-level Technician
• Installation and commissioning of MW SIEMENS , SRAL and SRAL XD
• Installation and commissioning of MW Alcatel (NECTAS)
• Installation of RECTIFIER
• Installation and wiring of masts
• Installation of BTS Alcatel G2 EVOLIUM
• Swap of antennas 900 by antennas 900-1800 (bee band)
• Installation of NEC MW (V2)
NEC(TUNISIA 2004)
• Installation of radio systems and PDH NEC
( approximately 20 links)
• Electric wiring, wiring earthen and RF installation
• Alarms wiring and test
• Out-door and in-door SDH installations
• Studies, engineering and checking
• Installation of RECTIFIER
SO.TE.TEL (Tunisia 2003-2004)
• Installation of numerical and analogical PABX (Alcatel, Ericsson, LG.
• Installation, wiring and commissioning of ACOM 100 alarm system
• Installation of Public Call Boxes
• Installation and wiring of the data-processing network