Vincent - Chef de projet SAP PS

Ref : 070826D002
Photo de Vincent, Chef de projet SAP PS
Compétences
SAP PS
Expériences professionnelles
  • PROFESSIONAL EXPERIENCE EXTRACT

    SAP FI, CO, PS Expert
    Design and customizing expert on modules in the area of controlling and project management. Examples of significant projects:
    IFR15 implementation with SAP RAR (Airbus Defense and Space)
    Design and implementation of IFRS15 regulation with SAP RAR module for headquarter.

    Gap analysis and Core model roll-out (DALKIA Belgium)
    Gap analysis for an SAP French Core model roll-out on Belgium, the Netherlands and Luxembourg.

    Responsible for functional integration of the following domains (Asset accounting, Project system, Controlling and Loans management).

    Audit of a legacy SAP System (MICHEL THIERRY)
    Evolution recommendations of an Automotive Parts manufacturer SAP legacy system. RFP document definition for the new SAP system

    Design of an SAP DVA offer (SAP + Euriware)
    Designing of a pre-customized offer for engineering companies in partnership with SAP. SAP Partner Edge program pre-sales certification.

    Subsidiary roll-out (Technoplus Industrie - Areva)
    Project leader for this Areva subsidiary, key business functionalities relying on CO and PS SAP modules.

    Spot consulting on Finance Area (PSA Peugeot Citroën)
    Involved as SAP Finance expert especially on cost controlling area for the implementation of Plant Maintenance functionalities (ECC5, FI, CO, PM, PS)

    Core Model Design and Implementation – Team Lead
    Project or domain leader on SAP project implementation.
    Examples of significant projects:

    Integration Manager for a new SAP implementation (AXA Group Solutions)
    Full lifecycle implementation of an SAP Professional Services Core Model for the 9 countries in Europe and India. Recommendation for the simplest and more suitable design between SAP PS and cProject in the context of Professional Services activity. Taking into account an organization change with the merge of different services of several companies of AXA group in one single legal entity AXA Group Solutions. Switch from a budget control model to a customer client relationship with VAT optimization through GIE.

    Scoping and core model design manager (AREVA NP)
    Scope survey and implementation scenario recommendations for a SAP Core Model (ECC 6) for Germany, United-States and France. Gap analysis of French, German and US legacy systems with group new business requirements. General design of the core model (Corporate functions, Plant, Equipment, Fuel and Services business units).

    Finance domain leader (SNECMA Services, SAFRAN Group).
    Implementation of a SAP Aerospace & Defense solution for MRO (maintenance, repair operations) of aircraft engines. Detailed design phase. Trouble project context: workload under-estimated regarding business processes complexity. Confidence of the customer recovered in a previously conflicting context.

    Project Director
    Management of complex IS transformation projects in international contexts.
    Examples of significant missions:
    Project Manager on behalf of CFO (MELOX COGEMA Group)
    Rolling out of a group Core Model on two nuclear fuel assembly plants of the business unit (600 users). Coordination with the Group SAP Competency center in charge of the implementation. Successful go-live with official congratulation letter from the customer.

    Program manager (CEA, 15.000 p)
    Program management of a complete SAP ECC 5.0 upgrade. Steering and project committees’ organization. Coordination and follow-up of building team activities.
    Interim manager (AXA Group procurement, Paris)
    Interim manager for global roll-out of Ariba e-procurement platform.
    Handover with the successor on the position.

    PROJECTS HISTORY
    CLIENT
    Project
    Areas covered
    Role and contribution
    Start
    End
    SMAC
    (Construction)
    Issy-les-Moulineaux
    Project system (PS)
    Finance Controlling
    Integration
    Revenue recognition
    Solution architect
    S/4 Hana 1909 greenfield implementation
    March to Oct 2020
    7 months
    Engie
    (Energy sector)
    Paris
    Finance Controlling
    Process and tools

    Interim Manager
    SAP competency center
    Nov. 2019 to Feb 2020
    4 months
    UCPA
    (Tourism)
    Paris
    Finance Controlling
    Fiori

    Project manager:
    Upgrade of ECC 6.0 to S/4 Hana 1709
    June
    to Oct. 2019
    5 months
    ELSAN
    (Healthcare)
    Neuilly-sur-Seine
    Finance Controlling
    Fiori

    SAP FI CO Expert:
    S/4 Hana 1809 greenfield implementation with externalization to shared services offshore
    October 2018
    to May. 2019
    8 months
    Thales
    (Aerospace & Defence)
    Gennevilliers
    Project system (PS)
    Finance Controlling
    Revenue recognition
    Customer service
    SAP FI CO PS Expert:
    Post go-live support task force
    March
    to Sept. 2018
    7 months
    GE Renewable
    (Energy sector)
    Head office in Paris area
    Switzerland (Baden)
    Project system (PS)
    Finance Controlling
    Revenue recognition
    ASC 606
    SAP FI CO PS Expert:
    ASC606 implementation
    June 2017
    to Jan. 2018
    7 months
    Airbus DS
    (Aerospace & Defence)
    Head office in Paris area
    Finland (Helsinki)
    Project system (PS)
    Finance Controlling
    Revenue recognition
    SLO Carve-out
    SAP FI CO PS Expert:
    Business blueprint Carve-out for Saudi Arabian Branch of a Finnish entity (SAP SLO). IFRS15 implementation RAR
    July 2015
    to April 2017
    22 months
    Technip
    (Offshore engineering)
    Head office in Paris
    ME office Abu Dhabi
    IFS
    Data Migration
    Finance Controlling
    Project management
    Project manager:
    Roll-out for Middle East entities of ERP core model solution based on IFS.
    July 2014
    to June 2015
    12 months
    Thales
    (Aerospace & Defence)
    Velizy
    Project system (PS)
    Finance Controlling
    Revenue recognition
    SAP FI CO PS Expert:
    PS Mock-up for proof of concept on IAS11 and IAS18.
    May 2014 to June 2014
    2 months
    JCDecaux
    (Advertisement)
    R&D office in Paris
    Project system (PS)
    Network Scheduling
    Capacity planning
    Assembly processing
    Finance Controlling
    SAP FI CO PS Expert:
    PS Mock-up for feasibility study for the R&D department.
    September 2013 to April 2014
    10 months
    Chanel
    (Luxury industry)
    Financial dept head-office in Paris
    HFM (Hyperion)
    FDM (ETL)
    Essbase
    Project manager:
    New design of consolidated group financial reporting (European scope).
    September 2012 to July 2013
    11 months
    Bosch S.A.
    (Packaging machine Cie Lausanne – Switzerland)
    Key-user training
    Project system (PS)
    Network Scheduling
    Capacity planning
    Assembly processing
    Finance Controlling
    Profitability analysis (CO-PA)
    SAP FI CO PS Expert:
    Documentation and training on a legacy SAP solution
    PS integration with SD (billing plan, milestone billing,) MM/PP (BOM transfer, assembly processing, network scheduling) and HR (time keeping)
    March to June 2012
    4 months
    (Part time)

    Subsea7
    (Offshore engineering Cie– France – Nigeria)
    Template roll-out
    Project system (PS)
    Network Scheduling
    Controlling
    Time tracking (CATS)
    SAP CO PS CATS Expert:
    Gap analysis and template roll-out for a core model in France and West Africa
    May 2011 to February 2012
    10 months
    AXA Group
    (Insurance – France – Paris)
    Process and Tools
    eProcurement
    eSourcing
    Interim Manager for Group Procurement Dpt
    Ariba eProcurement and eSourcing.
    October 2010 to March 2011
    6 months
    PUBLICIS
    (Professional services – France – Paris)
    Data conversion
    Conversion team (SAP ECC 6.0).
    Roll-out for France, US and UK.
    April to September 2010
    6 months
    DAHER-SOCATA (Aerospace & Defence – France – Tarbes, Orly)

    Functional integration

    Aircraft production

    SAP PS consultant (ECC 6.0).
    Blueprint for a core model.
    PS integration with MM, SD, PP, FI and CO

    October 2009 to March. 2010
    6 months
    DALKIA Benelux
    Roll-out of Group Core Model (SAP ECC 6)
    Functional integration
    Asset accounting
    Project system (PS)
    Controlling
    Loans management
    SAP IM AA CO PS Expert:
    Gap analysis for a core model roll-out in the three countries of Benelux
    Mar to July 2009
    KAEFER Germany (Bremen)
    Bid process
    Proof-of-concept prototyping
    Project leader and SAP Expert:
    In charge of a 10 consultants team for writing a SAP HR PS FI CO proposal
    Feb to Mar 2009
    ENEL France (Utility)
    Paris, Lyon
    SAP ECC 6.0 go-live roll-out
    Support on:
    Accounting
    Controlling
    Project system
    SAP FI/CO/PS expert :
    Go-live support
    End-user training
    Dec 2008 to
    Jan 2009
    AXA GROUP SOLUTIONS
    Full lifecycle implementation of a SAP Professional Services core model (9 countries Europe, India)
    Functional integration

    Project system (PS)
    Scheduling
    Time tracking (CATS)
    cProject
    Domain leader CO/PS :
    Blueprint and detail design
    Implementation (end-to-end)

    Integration Manager
    Apr to Dec 2008
    MICHEL THIERRY (Automotive Parts manufacturer)
    SAP PS expert (ECC 6.0 R&D, PLM, NDPI).
    SAP PS Expert:
    Audit of legacy SAP system.
    Evolutions recommendations.
    RFP document definition
    Mar 2008
    CMI
    SAP ECC 6.0
    FI-CO-PS-SD-MM-PM-CS-QM
    Project system (PS)
    Network Scheduling
    Maintenance (PM/CS)
    SAP PS Expert:
    Prototyping : assembly processing, investment project with AUC, service order, engineering and maintenance projects, time tracking (CATS).
    Nov 2007
    to
    Feb 2008
    SNECMA SERVICES
    SAP ECC 6 Aerospace & Defence
    FI-CO-PS-SD-MM-PM-CS-QM-Material ledger.
    Finance
    Controlling
    MRO
    FI/CO/PS Domain Lead
    June to Oct 2007
    MEDA PHARMA
    SAP R/3 v4.7 FI-CO-SD-MM-PP
    Project management (SAP system maintenance)
    SAP outsourcing manager
    Dec 2006
    to
    June 2007 part time
    TECHNOPLUS INDUSTRIE
    SAP R/3 Implemenation (v4.7 FI-CO-PS-MM-SD-PP)
    Project System (PS)
    Network Scheduling

    Project Leader for this TECHNICATOME subsidiary roll-out.
    Dec 2006
    to
    June 2007 part time
    PSA PEUGEOT CITROËN
    Implementation of Plant Maintenance. ECC 5.0 (FI-CO-PM-PS).
    Maintenance cost control
    SAP Finance expert for spot consulting.
    Dec 2006
    to
    Feb 2007
    Part time
    SGN (Nuclear engineering – Saint-Quentin-En-Yvelines)
    Finance, Controlling
    Project system (PS)
    Network Scheduling
    Advisor for Acceptance Testing phase of Cosmos project (implementation of SAP R/3 v. 4.7 FI-CO-PS-MM-PP).
    Sep to Nov 2006
    CEA
    Nuclear Research Center (15.000 p)

    Upgrade to SAP ECC 5.0. (FI, CO, PS, SD, MM, HR)
    Program management

    ECC5 Upgrade
    Program manager :
    Steering committee organization
    Project committee organization
    Coordination and follow-up of building team activities
    Jan to April 2006
    AREVA NP
    FRAMATOME ANP, (France, Germany, USA)

    Implementation of SAP in the USA

    Design and roll-out of a SAP Core Model SAP for 3 countries (France, Germany, USA)
    Project system (PS, CO)

    Functional integration Lead

    USA Project
    CO, PS consultant:
    Workshops, requirements analysis
    Gap analysis
    Detail design of project management area (project cost control).

    Gap analysis of French, German and US legacy systems with group new business requirements.
    Core Model project
    General design
    (Corporate, Plant, Equipment, Fuel and Services business units).
    Integration Manager in charge of domain coordination on SAP ECC 6.0. FI, CO, PS, SD, MM, HR, PP.
    May to Nov 2005

    Feb to July 2006

    COGEMA
    (Headquarter)

    Purchasing
    IS Department Purchasing process audit
    Reporting statement definition on SAP R/3 4.5 : FI, CO, MM modules.
    Jan to March 2005
    Part time
    MELOX / COGEMA
    Roll-out of a Group Core Model on two nuclear fuel assembly plants and 3 companies.
    Project system (PS).

    Project management.
    Project Lead:
    Project management on behalf of the CFO of the business unit

    Jan 2004
    to
    March 2005
    ELFICOLD
    (equipment manufacturer for the retail industry)
    Roll-out of SAP R/3 Core Model SAP R/3 on European plants.
    Controlling (CO)

    Accounting (FI)

    Product configuration
    FI/CO roll-out leader (FR, UK):
    Fit gap analysis
    Core model localization

    Sep 2003
    to
    Jan 2004
    RTE (EDF)
    Upgrade & maintenance of live SAP R/3 system: Investment management implementation
    Investment management (IM)

    Project system (PS)
    IM, PS consultant:
    Business requirements analysis
    Prototyping
    Design
    Customizing
    Feb 2002
    to
    April 2003
    Several SAP R/3 3.0 to 4.6b release, core model design and roll-out for world-class industry leaders

    Projects in main European countries (Germany, Italy, Sweden, Spain, UK, Belgium).

    Automotive: HONEYWELL

    AIR FRANCE

    Retail:
    BRICO, PICWIC

    Industry:
    KME
    PECHINEY

    Pharmaceuticals:
    NOBEL BIOCARE (Sweden)
    Controlling: CO and sub-modules, CO/PA, CCA, PCA
    Project Management:
    Scope control
    Planning
    Team lead

    CO Domain Leader:
    Blueprint and detailed design
    Customizing
    End-user training
    Tests, data conversion
    Go-live & support

    June 1997
    to
    Jan 2002

Études et formations
  • Past Experience

    French Military Forces in Germany 1993-1994 (Second lieutenant)
    TDF, 1994-1996 (Head-office Junior Cost controller).
    IBM Global Services, 1997-2003 (Consultant, Manager)
    PEA Consulting Euriware, 2004-2007 (Senior Manager)
    Freelancer since 2007

    Consulting Skills
    Project Management, Team Management
    Business Process Design : Controlling, finance
    IS Audit
    Bid process
    Full life cycle implementation (Blueprint, customizing, test, go live, training, take-over)
    Outsourcing
    Pre-customized solution offer design
    SAP:
    Core solutions design, build, implementation and run with multi-sites and multi-country teams
    Project management, Engineering, Professional Services
    SAP PS (finance and logistic), CO, cProject, PLM, RAR
    SAP FI, IM, CATS, PM, CS
    PS integration with SAP SD, MM, PP, HR

    Languages
    French (mother tongue)
    English
    German (basics)

    Education
    Executive MBA HEC, 2010
    BA, ESC Le Havre Business School, 1993 (specialized in Controlling and Finance)
    DPECF (Basic accounting French diploma)

    Other
    Pre-sales SAP Certification (All-in-one Channel Camp Barcelona)

D'autres freelances
Chef de projet SAP CO

Ces profils pourraient vous intéresser !
CV Consultant Supply Chain-  SAP MM / SD
Davine

Consultant Supply Chain- SAP MM / SD

  • LIMOURS
SAP MM SAP SD SAP PP SAP CO SAP QM
Disponible
CV Chef de projet SIRH SAP HR / Directeur de Projet SIRH
Olivier

Chef de projet SIRH SAP HR / Directeur de Projet SIRH

  • BÉTHUNE
SAP HR SAGE 100 COMPTA SAGE 100 PAIE SAP FI SAP CO SAP AA
CV Chef de projet INFORMATICA
Aissata

Chef de projet INFORMATICA

  • FRESNES
INFORMATICA SAP FI SAP CO SAP BW
CV Expert fonctionnel / Chef de projet SAP Finance
Junior Abouem

Expert fonctionnel / Chef de projet SAP Finance

  • VILLIERS-SUR-MARNE
SAP FI SAP ECC SAP CO SAP S/4 HANA SAP SD SAP MM
CV Business Analyst SAP BI
Valentin

Business Analyst SAP BI

  • MONTÉVRAIN
SAP BI SAP BPC SAP CO-PA SAP BEx SAP BUSINESS EXPLORER SAP CO SAP BW EXCEL VBA SAP BFC
CV Consultant fonctionnel SAP FI-CO
Guillaume

Consultant fonctionnel SAP FI-CO

  • VILLEMOMBLE
SAP FI-CO SHAREPOINT SAP FI SAP CO SAP MM EXCEL PYTHON SAP SD SAP PS
CV Chef de projet SAP
Nabil

Chef de projet SAP

  • Paris
SAP SAP FI SAP CO SAP AA SAP BI SAP BPC SAP BUSINESS EXPLORER SAP BW SAP BPS SAP MM
CV Chef de projet SAP CO
Thierry

Chef de projet SAP CO

  • VAUCRESSON
SAP CO SAP ERP
CV Business Analyst SAP
Jacques

Business Analyst SAP

  • Paris
SAP SAP CO SAP CO-PA SAP FI-AP SAP HANA SAP CO-PC SAP FI-AA SAP FIORI SAP BI
CV Chef de projet SAP
Philippe

Chef de projet SAP

  • Saint Avertin
SAP SAP CO-PA SAP CO-PC SAP CO-OM SAP FI-AP SAP CO PS SAP FI SAP CO SAP PS C++