JOB-RELATED EXPERIENCE DETAILS:
Actuel
Entreprise : SOFEDIT GESTAMP (Equipementier Automobile)
Fonction : RESPONSABLE TECHNIQUE & MAINTENANCE
Lieu : St Romain du COLBOSC
Descriptions : Statut Cadre. / Equipe CODIR.
-Suivie des Indicateurs IATF /ISO 9001 – IS014001
-Mangement du Service Maintenance, Tx de panne, Améliorations Continues,
vérifications Obligatoires …
-Projet Manager, Pilote de Processus, Mise à Jour de documentations Technique, BDT
sous SAP, AMEDEC, Création de Cahier des Charges ...
-Gestion du Magasin Général.
-Correspondance des Projets en Anglais & Portugais.
-Equipements spécifiques (Robots ABB , KUKA , MotoMan, Système de Soudure
Tucker ,Fronius Pince ARO, Tours Aéro Frigérante..) .
Octobre 2016 – Avril 2019
Entreprise : ORIENTIS GOURMET (Fabrication & Distribution de Thé)
Fonction : RESPONSABLE TECHNIQUE & MAINTENANCE (Bâtiments &
Equipements)
Lieu : St Vigor d’Ymonville
Descriptions : Statut Cadre / / Equipe du CODIR.
– Mise en Place avec le service Qualité de l’ISO 22000.
-Installation & Configuration de deux nouvelles lignes de productions de Sachets de
THE (Machine Provenant du Japon, Italie …). Suivie Effectué en Anglais (FAT &
FMEA)
-Mise en Place GMAO, Magasin Maintenance, Suivie de Travaux Neuf,
Documentations, Plan de Prévention…)
-Equipements spécifiques (Twinkle, NASA, Cellophaneuse Involtec, Doseuse de marque
ICA, IPS , Centrale de Traitement d’air , Dépoussiéreur ..)
-Gestion des Obligations Règlementaires (Bâtiment & Machine)
-Gestion des Energies & Environnement (Speem)
Entreprise : TECHNIP
Fonction : RESPONSABLE MAINTENANCE – Rattache au Responsable du
Site (Capitaine, Directeur)
(Equipe de plus de 15 personnes, Anglais, Brésiliens, Français et Philippins)
Lieu : Corée & Brésil – Bateau Top Estrela do Mar
Descriptions : Statut Cadre
-Démarrage et Installation du Système de Maintenance sous MAXIMO, Création
Magasin de pièces de Rechange, Tache de Maintenance Préventive & Correctives.
-Responsable de Maintenance des Equipements Offshore - PLS 550T (Portable
Pose Système), A&R Treuil 600T …
-Gestion des Budgets (R&M, MRC, CAPEX)
-Gestion des Actions de Sécurités Synergies, NCR (Non-Conformité), Garantie.
-Suivie des Modifications d’automatisme (Automate Siemens, ABB ACS 800,
SCADA ORCHESTRA) de plusieurs Bateaux Fabriques en Corée.
Entreprise : TECHNIP – COFLEXIP - FLEXIFRANCE
Fonction : RESPONSABLE AUTOMATISME & SAV rattache au Bureau
d’étude.
Lieu : LE TRAIT - FRANCE
Descriptions : Statut Cadre
TECHNICAL ASSISTANCE – PLC & ELECTRICAL pour tous les
February 2009 SUPERVISORS ON THE VERTICAL LAYING SYSTEM VLS1 (STYBARROW, VINCENT, LAMINARIA).
May 2007 AUDIT TECHNICAL ON THE POSITIONEMENT PIPELAY SYSTEM PPS01 (STYBARROW).
December 2006 MANAGEMENT ELECTRICAL OF BUDGET - 3 TRI CATS 40T (300Keuro)
September 2006 CONCEPTION OF PROGRAMS: Vertical Laying System (VLS1) - Tri-cats 30T - Carousel 2000T
June 2006 VIKGING BARGE (DALIA).TECHNICAL SUPERINTENDENT ON INSTALLATION THE EQUIPMENTS
(Tri-caterpillar 40t connected together, Working Table , Winches …Commissioning & Safety)
January 2006 MANAGEMENT ELECTRICAL OF BUGET – 2 TRI CATS 20T (100Keuro)
December 2005 CONCEPTION OF PROGRAMS TRI-CATS 20T
November 2005 CONCEPTION OF PROGRAMS VERTICAL LAYING SYSTEM (VLS4 B)
September 2005 CONCEPTION OF PROGRAMS VERTICAL LAYING SYSTEM (VLS4 T) after Crane Accident
June 2005 SUNRISE (Vessel)
- Applications Migrations of Supervision Version 7 to Version 9.
- Installation of Data Server, allowing Recording of the equipment program history into the safeguard.
- Offshore technicians Training.
March 2005 TRI-CATERPILLAR 40T
- Software Development (Magelis). => Working and breakdown service.
January 2005 CREATION OF A TEST LABORATORY
- Allows the assistance, the Development and the Offshore Techs. Training of the Applications of Supervision, Automatism, History...
June 2004 UCS CAROUSEL
- Integration with the Duco factory (Production &Safety improvement)
February 2004 VERTICAL LAYING SYSTEM (VLS4)
- Monitoring INSQL Installation (System History.)
January 2004 VERTICAL LAYING SYSTEM BONGA
- Equipment’s Coordination (Tri Cats 40T, Winches)
March 2003 TOP VLS1 (PROJECT SCHIEHALION)
-Video system installation and Data-processing.
-Installation of First Monitoring system (INSQL) of the Pendular Winch 130T.
-Selection on the Franquelin Contest of the company.
February 2003 VERTICAL LAYING SYSTEM (VLS4)
-Assembly, Installation and Configuration of Computers (Supervision, Maintenance …)
January 1991 to 2009 Supervisor Offshore (VLS1 & VLS3….)
EDUCATION
2017 – Validation des Acquis Professionnels Cadre - Responsable Maintenance (PRODIAT)
1988-1990 :BTS MAI
(Maintenance Automatism Industrial)
1987-1988 :DSTU
(Diplôme Scientifique & Technique Universitaire – Option Informatique)
1985-1987 :BAC MSMA
(Maintenance des System Hydraulic, Mécanisés , Automatismes)
1983-1985 :BEP & CAP Electromécanique / Electromécanique
Languages Advanced English / Advanced Portuguese
COMPLEMENTARY TRAINING
-SYNERGIE
-Orca II
-MP5
-INSQL
- Industrial Structured Query
-Servers FTP
-Equipment Commissioning & FMEA procedure
-HYDRAULICS:
Proportional Valve
Hydraulic Ring ,Vickers.
-REGULATION GENERAL:
Reg 2 Cegetel (Perfection Level)
-SUPERVISION: Factory 9.5,
INSQL Servers 7.1 / 8.0/8.2,
Active Factory 8 / 8.5.
-AUTOMATISM: Schneider PL7 PRO,, VARIOUS NETWORK, UNITY PRO.
-COMPUTORS: Assembly, Breakdown Service, Servers, Various Networks, OS Windows 2000 …/ Vista /OS2 …, Word, Excel….
-JANUARY 2007 -- Assessment of Competence