Cedric - Assistant à maîtrise d'ouvrage SAP PP

Ref : 120606R002
Photo de Cedric, Assistant à maîtrise d'ouvrage SAP PP
Compétences
SAP PS
SAP SNP
SAP CS
SAP CO-PC
Expériences professionnelles
  • SAP Implementation Consultant
     GGB – Metal transformation (Oct 2011 – May 2012)
    Preliminary scoping and core model design of the solution based on SAP ECC

    Responsible for the overall integration activities
    Review of the global and local requirements
    Cross-check of the requirements with the Metal Industry and Automotive specificities
    Decision to use the “Mill Industries” solution and the “Fabricated Metal” Best Practices
    Design of a SAP ECC demo environment
    Introduction of the concept of product and batch characteristics as a management tool
    Direct support to the PP, MM, WM consultants
    Validation of the decisions taken on the SD, FI and CO modules

     Teleflex – Medical devices (Sept 2011 – May 2012)
    Improvement of the Warehouse processes (R/3)

    SAP WM & SAPconsole Expertise
    Process improvement recommendations regarding Inbound, Outbound and Internal replenishment
    Solution prototyping
    Identification of the constraints related to the SAP version in production (R/3 4.6C)

     IPSEN – Pharmaceutical (Mar 2011 – Jun 2011)
    Local (Signes) post deployment process improvement (ECC)

    Responsible for project management and solution engineering during the blueprint phase
    Process review for Production confirmation (PP), Material staging (WM) and Master Data Mgmt
    Recommendations for a spare parts warehousing information system based on SAP

     Carrier – HVAC (Nov 2010 – Mar 2011)
    Deployment of SAP R/3 for the manufacturing, purchasing and industrial controlling processes

    Responsible for project management and solution engineering during the blueprint phase
    Presentation of Atos Origin Value Proposal
    Proposal and contract negotiation management
    Management of Atos Origin initial project engagement.
    Responsible for the solution and integration design with a specific focus on product configuration
    Temporary WM team leader during the blueprint phase

     Eurocopter – Aircraft Manufacturer (Nov 2008 – Jan 2009)
    Feasability study for the integration of the online spare parts selling process with credit card payments

    Responsible for coordinating Eurocopter various stakeholders towards one set of agreed processes
    Identification of the different online spare parts sales processes
    Review of the process design in SAP SD
    Identification of the constraints of the various stakeholders (Accounting, Finance, Sales, Pricing, etc.)
    Definition of a target solution integrating SAP SD with SIPS (online payment solution)

     Monier (Lafarge couverture) – Tile Manufacturer (Jan 2008 – Dec 2008)
    Deployment of SAP R/3

    Responsible for project management and solution engineering
    Presentation of Atos Origin Value Proposal
    Proposal and contract negotiation management
    Management of Atos Origin initial project engagement.
    Management of the partner responsible for the Business Process Reengineering phase
    Directly responsible for the global solution and integration design
    Temporary PP team leader during the blueprint phase
    Initial supervision of the project manager in charge of the subsequent delivery phases

     Inmac – IT equipment distributor (June 2006 – Aug 2007)
    Deployment of SAP R/3 and integration with customer CRM and sourcing solution

    Responsible for deployment of the MM Purchasing and Planning functions
    Identification of customer needs
    Solution design
    Configuration and implantation of the solution
    Integration with customer sourcing tool.
    Master Data conversion
    Post Go-Live support

     Standard Product – Lighting systems distributor (Aug 2005 – Sept 2005)
    Deployment of SAP R/3, SAP SCM and SAP CRM (internet sales)

    Responsible for the Blueprint design on the logistic side (R/3 PP/MM/Transportation and SCM DP/SNP)
    Coaching of the customer during the blueprint phase.
    Solution design to manage the warehouse network and inbound transportation constraints in SAP.

     The Resolution Group – Employer Internal Project (June 2005 – Aug 2005)
    Deployment of the first APO environment of the company (SCM 4.0)

    Responsible for the environment setup: the purpose of this APO system was to support the training and skills development of the consulting team.
    Deployment of DP and SNP scenarios based on SAP SCM Best Practices
    Integration with the R/3 (CIF interface)
    Support to the Basis expert

     ABB Canada (Feb 2004 – June 2005)
    Missions in different divisions
    Lachine division – Electrical switch and breakers distribution center
    Implementation of Consumption Based Planning (MM and PP modules)
    Implementation of SAP Consumption based planning (forecasting and dynamic reorder points)
    Implementation of good business practices in the purchasing department
    Adjustment of the MM & PP modules configuration
    Training and support of the users

    Bomen division – Spectrometry
    Stabilization of the implemented solution (MM, PP, PS modules)
    Update of the operational data
    Adjustment of the MM & PP modules configuration
    Additional ad hoc training of users

    Improvements of customer service business processes (CS/PM and SD modules)
    Introduction of the SAP service orders (CS/PM) in the calibration and customer support departments
    Configuration of the SD & CS/PM modules

    Coaching of the customer during the redesign process of its product structure (PP, LO-VC modules)
    Definition of new product structures based on SAP Variant configuration
    Management of serial number traceability within the product structure
    Management of the impacts on the different departments of the organization (Sales, Marketing, Engineering and Finance)

    Bomen division – Remote Sensing (Aerospace applications)
    Reengineering of the project structure for large scale, technical projects (MM, PS & CO modules)
    Evaluation, prototyping and implementation of a system engineering approach
    Redeployment of the SAP PS functionalities
    Integration of the whole manufacturing process within PS
    Training and support of the users

    High Voltage Power Transformer division
    Solution Design (PS module)
    Prototyping of a solution to meet the capacity and scheduling requirements with PS
    Recommendations regarding the definition and the implementation of the solution
    Ad hoc implantation support

     Camoplast – Recreational Products Division (Automotive) (Nov 2003 – Feb 2004)
    Modifications in the SAP R/3 system

    Responsible for system modifications aiming to simplify the logistic process, production cost management and inventory control (MM, WM, PP and CO modules). Implementation of the Repetitive Manufacturing process (planning and execution) for the whole Recreational Product Division.
    Identification of customer needs
    Solution design
    Configuration and implantation of the solution
    Master Data conversion
    Post Go-Live support

     Axcan Pharma (Pharmaceutical) (Apr 2003 – Oct 2003)
    Implementation of SAP R/3 system

    Responsible for the implantation of the MM, WM and PP-PI modules
    (Including Batch Management)
    Identification of customer needs
    Solution design
    Configuration and implantation of the solution
    Master Data conversion
    Post Go-Live support

     SaarGummi America (Door seals – Automotive) (Nov 2002 – Dec 2002)
    R/3 implementation feasibility study

    Evaluation of customer business needs
    Evaluation of the business needs regarding the PP module of SAP R/3
    Evaluation of project implementation costs for the manufacturing section

    Pre-sales
    (Jan 2001 – Aug 2007)
     Evaluation of customer needs and realization of personalized SAP demonstrations

    Excellent overall understanding of SAP various solutions:
    Industry Solutions
    SAP Best Practices
    Implementation methodology based on “Building Blocks”
    Technological Solutions like SAP SOA and BPX

    Logistics components demonstrated:
    Sales & Distribution
    Production Planning
    Material Management
    Quality Management
    Logistic Execution (Warehouse Management, Transportation)
    Cross-Application Components:
     Classification
     Variant Configuration
     Batch Management
     Document Management System

    Demonstration environments used:
    SAP R/3 and SAP APO IDES version (SAP demonstration system)
    SAP R/3 PCC version (Pre-Configured Client)
    SAP R/3 Best Practices versions (Country & Industry specific)

    Additional SAP Support Missions (very short mandates between 2001 and 2006)
     Vitembal (Food Trays)
    Reengineering project leaded by Kea & Partners (consulting firm)

    Definition of planning strategies within SAP and recommendations regarding the whole information system
    Identification of business requirements and constraints
    Coordination with the reengineering team
    Definition of parameters to help define supply chain solutions within SAP
    Recommendations regarding the design of the production execution system

     Dutailier (Wood Furniture Manufacturer)
    Review of the production Master Data

    Review of the BOM structure using the Variant Configuration module (LO-VC)
    Identification of customer requirements
    Design of a solution allowing the use of a unique BOM for each product family
    (This solution helped to divide by 200 the total quantity of BOMs to be managed)

     Brother Canada (Consumer Goods Distributor)
    Implantation a new business process

    Adaptation to the Canadian context of the sales planning model
    Implantation the Sales and Operation Plan function in SAP R/3 (PP module)

     Isofab (Insulation Panels Manufacturer)
    Review of the SAP R/3 PP module utilization

    Review of the manufacturing execution processes
    Manufacturing strategy choice
    Training of Isofab employees on the management of production order statuses.

     The Victoriaville Group (Wood Casket Manufacturer)
    Implantation of new production management processes
    Implementation of a Kanban model
    Identification of the business needs
    Solution Design

    Implantation of SAP R/3 in the manufacturing plant and the distribution centers
    R/3 Implantation final tests and go-live support
    Support to final integration tests
    Adjustment of planning parameters
    Support to super-users during go-live

     Trudeau (Consumer Goods Distributor)
    Training on SAP R/3

    Training of the internal project team
    Level 2 training on the WM module of SAP R/3

     South Shore Industries (Wood Furniture Manufacturer)
    Training on SAP R/3

    Training of the internal project team
    Level 3 training on the PP module of SAP R/3
    Training on the cross-application components used in master data management

     Draxis (Pharmaceutical sector)
    Review of business processes using SAP R/3

    Coordination of activities and consulting
    Coordination of the Sales & Distribution process review
    Training on the management of the Material Master
    Training on the Resource Selection feature in PP-PI

     Kontron (Electronic / Telecommunication)
    On-going support to a live version of SAP R/3

    Training of SAP super-users
    Level 3 training on Product Data Management (PDM) in SAP R/3

Études et formations
  • Education
    2008-2011 Edinburgh Business School – MSc in Human Resources Management (UK)

    2006-2008 Edinburgh Business School – Post-MBA Specialization in Strategic Planning (UK)

    2001-2005 Master of Engineering in Technology Management at Montreal Ecole Polytechnique (Canada)

    1999-2001 Edinburgh Business School MBA (UK)

    1992-1998 Engineering Degree from the “Institut Catholique d'Arts et Métiers de Lille” (France)

    1996/97 One academic year at the Technische Universität Hamburg-Harburg (Germany)

    Readings Various books and articles on management, economics and social issues.

    SAP Education on SAP logistics applications.
    Production Planning (PP) / Material Management (MM) / Project System (PS) certifications.

    MS Office Good knowledge of most MS Office applications including MS PowerPoint, MS Project and MS Visio

    Languages
    French: Mother Tongue
    English: Fluent
    German: Good level (could be brought back to fluency level)

D'autres freelances
Chef de projet SAP PP

Ces profils pourraient vous intéresser !
CV Consultant Supply Chain-  SAP MM / SD
Davine

Consultant Supply Chain- SAP MM / SD

  • LIMOURS
SAP MM SAP SD SAP PP SAP CO SAP QM
Disponible
CV Chef de projet SAP /Directeur de programme SAP
Amine

Chef de projet SAP /Directeur de programme SAP

  • CERGY
SAP SAP S/4 HANA SAP SCM SAP PP SAP EWM SAP MM SAP APO SAP QM
CV Chef de projet Supply Chain
Emilie

Chef de projet Supply Chain

  • NOISY-LE-GRAND
Manufacturing & Supply Chain EXCEL SAP MM Microsoft Power BI SAP PP DIVALTO
CV Chef de projet Digital & Supply Chain
Bondji

Chef de projet Digital & Supply Chain

  • LILLE
SAP MM SAP PP SAP ECC AGILE ITIL PROJECT MANAGEMENT OFFICE SAP S/4 HANA
CV Chef de projet SAP ECC6 / S4HANA
Salma

Chef de projet SAP ECC6 / S4HANA

  • ORLY
SAP SAP SD SAP MM SAP WM QTEST SAP PP JIRA
CV Chef de projets SAP QM PP MM
Clémence

Chef de projets SAP QM PP MM

  • COURBEVOIE
SAP QM SAP PP SAP MM
CV Chef de projet SAP
Philippe

Chef de projet SAP

  • CHAVILLE
SAP EHS SAP SAP QM SAP PP SAP SD SAP MM SAP ALE SAP EWM
CV Digital Transformation Expert (MES) & IT Project Manager
Andre

Digital Transformation Expert (MES) & IT Project Manager

  • TOULOUSE
SAFE AGILE LEAN MANAGEMENT MES SAP MM SAP PP SAP PM
CV Chef de projet SAP
Marion

Chef de projet SAP

  • ALBENS
SAP SAP PP SAP SCM
CV Testeur/ QA
Aaron

Testeur/ QA

  • COLOMBES
EXCEL VBA MOA JIRA SQL SAP PP SAP MM SALESFORCE VARONIS SQUASH