Didier - Chef de projet DATACENTER
Ref : 120412M003-
L3469 DUDELANGE (Luxembourg)
-
Chef de projet, Formateur, Assistant à maîtrise d'ouvrage (54 ans)
-
Freelance
Summary :
Since 2012 - Present
Datacenter Design Trainer at Datacenter Dynamics :
- Served as trainer for international French course DCDA and EEBP;
- Translate English material in French technical form.
Datacenter advisory services for Panduit and Bull
Since 2007 - Present
Responsible for designing and engineering the infrastructure for European Parliament's Datacenters, Data / Telecom Rooms, structured cabling and LAN:
- Served as design consultant for new Data Centre and large structured cabling in a building extension;
- Assist top management to providing analysis to improve the infrastructure quality of 60 existing Data Centre and Data Rooms;
- Assistance to the owner, monitoring support and receipt of the lot of infrastructure data / telecom sites extensions and structured cabling (Optic Fiber and copper from cat3 to cat7).
From 1994 to 2006
Project management, audit, design, implementation, training and validation among key accounts in Europe and Morocco.
Responsibility for the engineering of network infrastructure and structured cabling including all key positions of developing a new network to sustainability and homogenization of complex networks of any kind :
Designing of tenders;
Data analysis and implementation specifications;
Customer relations and explanation of the technical solutions chosen;
Implementation of the deployment strategy;
Drafting and preparation of technical documents;
Security audit and quality of network operation;
Technical training;
Validation of as built and certification infrastructure networks (compliance with the ISO11801);
Datacenter Design (Networks, Power, Cooling system, Access Control / Intrusion);
Support project management.
TRAINING
1. BICSI ANSI/BICSI 002-2011, Data Center Design and Implementation Best Practices and TDMM
daily use Annual conferences (Brighton, Paris, Dublin, Edinburgh)
2. European commission Code of Conduct on Data Centres Energy Efficiency daily use
3. Uptime Institute Tier Standard daily use
4. EN 50173-5 Data Center Standards daily use
5. TIA 942 Data Center Standards daily use
6. ISO 11801 Structured cabling daily use
7. PMI Project Manangement daily use PMBOK
8. Leadership Dale Carnegie 20 French workshop in France (Toulouse)
PROJECT EXPERIENCE - 01
Project name: KAD II
Company: Orange Business Services
Dates : Start: 03/07 End: Present
Client : European Parliament
Project size: 10 M€
Project description:
Analysis program originally established Project (2002), analysis of changing needs, Data Center, Telecom and LAN design, updated specifications, proposal analysis of the research department.
Employee’s Roles & Responsibilities in the project:
The actions are grouped into four areas of activities covering the period of this project:
1. Analysis of the original program:
The original program provides businesses and public areas; this project is abandoned for exclusive use by the EP and other institutions.
2. Changing needs:
The obsolescence of technology and the evolution of Parliament (integration of new countries, new tools) are changing the needs and expectations of impact energy and infrastructure Data / Telecom. An analysis of the electrical power has been conducted.
3. Design and update specifications:
The specifications were prepared to undergo an update to follow the major developments of the standard ISO 11801, TIA 942 and Uptime Institute tiers.
4. Analysis of the Structural engineering company technical proposals
Technologies and methodologies used by the employee in the project:
• ANSI/BICSI 002-2011, Data Centre Design and Implementation Best Practices and TDMM
• Uptime Institute Tiers
• ISO 11801 / TIA 942
PROJECT EXPERIENCE - 02
Project name: Archibus
Company: Orange Business Services
Dates : Start: 12/08 End: Present
Client : European Parliament
Project description:
Monitoring project implementation and operation of a cabling management software (Archibus)
Employee’s Roles & Responsibilities in the project:
Project management:
- Identification of requirements of the European Parliament and correlation with the progress of the existing project
- Implementation of training users
- Followed by an audit report on the manufacturer's service
- Monitoring implementation of recommandations
Technologies and methodologies used by the employee in the project:
• Classic conduct project monitoring (Retro scheduling, task tracking, etc.)
PROJECT EXPERIENCE - 03
Project name: Data room extension
Company: Orange Business Services
Dates : Start: 01/08 End: 12/08
Client : European Parliament
Project description:
An existing Data room is enlarged by taking the area of underground car parc. Work in wholesale and finishing works are launched (conditioning / electricity) by facilities service following coordination of an architect for the proper standards and engineering rules in machine rooms following criteria qualities used in Data Centre (redundancy, standardization etc..)
Employee’s Roles & Responsibilities in the project:
Project Tracking:
- Design Data Centre extension
- Monitoring of weekly meetings
- Site visit daily
- Analysis of intermediates and final approvals
Technologies and methodologies used by the employee in the project:
• Classic conduct project monitoring (Retro scheduling, task tracking, etc.)
• ISO 11801
• ANSI/BICSI 002-2011, Data Center Design and Implementation Best Practices and TDMM
PROJECT EXPERIENCE - 04
Project name: President Building
Company: Orange Business Services
Dates : Start: 06/08 End: 02/09
Client : European Parliament
Project description:
Under the project KAD II, while part of the KAD existing offices must move to be free of nuisance site KAD II. A new building of 10,000 m2 is then rented by EP. The project is therefore to monitor the implementation of the entire network cabling.
Employee’s Roles & Responsibilities in the project:
Project Tracking:
- Design Wan connections / Data room / LAN
- Monitoring of weekly meetings
- Site visit daily,
- Analysis of intermediate and as built approvals
Technologies and methodologies used by the employee in the project:
• Classic conduct project monitoring (Retro scheduling, task tracking, etc.)
• ISO 11801,ANSI/BICSI 002-2011, Data Center Design and Implementation Best Practices and TDMM
PROJECT EXPERIENCE - 05
Project name: Upgrading of electrical floor distributor room KAD Building
Company: Orange Business Services
Dates : Start: 08/08 End: 02/09
Client : European Parliament
Project description:
The European Parliament has conducted a comprehensive project on the building KAD upgrading of floor distributor rooms electrical installations. My mission was to follow this in regard to IT rooms, in coordination with the consulting firm for the specific application of engineering standards and rules in the data rooms (redundancy, standardization etc..)
Employee’s Roles & Responsibilities in the project:
- Identification of requirements of the European Parliament and correlation with the progress of the existing project
- Monitoring of weekly meetings
- Site visit daily
- Analysis of intermediate and final approvals
Technologies and methodologies used by the employee in the project:
• Classic conduct project monitoring (Retro scheduling, task tracking, etc.)
• ISO 11801
• Bicsi TDMM
PROJECT EXPERIENCE - 06
Project name: Upgrading of HVAC systems floor distributor room KAD Building
Company: Orange Business Services
Dates : Start: 12/08 End: 12/09
Client : European Parliament
Project description:
The European Parliament has conducted a comprehensive project on the building KAD upgrading of HVAC floor distributor rooms. My mission was to follow in coordination with the consulting firm for the specific application of engineering standards and rules in the machine rooms (redundancy, standardization etc.)
Employee’s Roles & Responsibilities in the project:
- Identification of requirements of the European Parliament and correlation with the progress of the existing project
- Monitoring of weekly meetings
- Site visit daily
- Analysis of intermediate and final approvals
Technologies and methodologies used by the employee in the project:
• Classic conduct project monitoring (Retro scheduling, task tracking, etc.)
• ISO 11801
• Bicsi TDMM
PROJECT EXPERIENCE - 07
Project name: Improving the infrastructure quality of IT sensitive local (Luxembourg / Brussels / Strasbourg)
Company: Orange Business Services
Dates : Start: 12/09 End: Present
Effective number of months worked on the project: 1
Client : European Parliament
Project description:
Several critical failures at different sites have impacted business tools of the European Parliament. The Office of the Secretary-General has decided to set up a working group to ensure the IT department by strong measures to increase quality standards in the 60 computer rooms (data centers)
Employee’s Roles & Responsibilities in the project:
project management / organizational / methodology:
- Establishment of a systemic approach of the project,
- Installation of a perimeter
- Establishment of a standardized repository (TIA 942)
- Organisation of an inventory
- Analysis report inventory / repository
- Analysis of actions to be taken following the emergency, the underwriting profit and cost
Technologies and methodologies used by the employee in the project:
• TIA 942
• Référentiel ISO 11801
• Systemic approach
PROJECT EXPERIENCE - 08
Project name: Project management
Company: Freelance
Dates : Start: 01/94 End: 02/07
Client : Various
Project description:
Project management, Project management support, Datacenter expertise, technical validation
Employee’s Roles & Responsibilities in the project:
2006: Cap Gemini Toulouse, Study of the Head Office LAN infrastructure (6000 sq.m.), CCTP Design and engineering rules to ISO 11801.
2006: EADS Toulouse, Assistance to project management for the coordination of work energy, air conditioning, access control, video networks and a Data Centre in a offices building and Data Centre.
2005: Morocco Casablanca Alto, Engineering and Auditing network infrastructures Call Centre Expansion and upgrading of all (3,000 m²).
2005/2004: Airbus Toulouse, Validation of the Panduit infrastructure networks to ISO standard 11801 for Mills Star (A380) and training technicians of the cabling companies for Panduit certification.
2003: Toulouse CPAM, Assistance to project management for the coordination of infrastructure LANs (Commercial building 10,000 sq m).
2002/2001: Paco Rabanne / Nina Ricci Neuilly sur Seine, Audit on the rationalization of infrastructure LAN / WAN after merging the two companies. Studies of existing studies of new needs, design of new architectures LAN / WAN, creation of specifications, implementation of security policies, studies of the implementation of server rooms and telecom (Internal Data Centre).
2000: Post Bordeaux, project management assistance work for the LAN infrastructure copper and fiber optic (Building 7000 sq m).
1999/1998: Accor Casino Support of project management for the coordination of infrastructure LANs Casino Bordeaux, Carnac and Benodet.
1997: Groupe Le Duff Brioche Doree, Assistance to project management for the coordination of infrastructure LANs.
1994/1997: Toulouse, Assistance to project management for the coordination of infrastructure works in severals small LANs.
Technologies and methodologies used by the employee in the project:
• Référentiel ISO 11801
• Bicsi TDMM
CERTIFICATIONS
. DCDA / EEBP Datacenter Dynamics 2012 London / Milan
. European Code of Conduct for Datacenter endorser European Commission 2012 Brussels
Software expertise
Tool (precise manufacturer, product name and version(s)) Competence (5 -1)
(5 - over 5 years experience with a tool, 4 - between 4 and 5 years experience, etc.) Description (e.g. give relevant entries under “professional experience”)
Microsoft Windows Systems (XP, 2000, 2003) 5
• share
• workgroup
Microsoft Office 5
• Rapport
• Project
• Presentation
• Planning
• email
Autocad 2
• Consultation, print
• Basic Schema
• Correction